Construction of 4-Lane with paved shoulder Agartala bypass Western side, length 25.402 km connecting NH-8 near Amtali to NH-108B near Lembuchhera in the state of Tripura on EPC basis under NHO-NE

Ministry of Road Transport & HighwaysTripura
Revised Cost: ₹2026 CrUtilization: 22.8%

Original Cost

₹2026 Cr

Baseline estimate

On budget

Revised Cost

₹2026 Cr

Latest approved cost

Expenditure

₹462 Cr

Spent to date

Utilization

22.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1564 Cr

Budget left

Budget Utilization

22.8%
0%25%50%75%100%

Spent

₹462 Cr

Remaining

₹1564 Cr

Total

₹2026 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/03/2027

Revised Completion

09/03/2027

Completed

Project Details

Project Code618417
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTripura
Data Month2026-08

Financial Summary

Original Cost₹2026 Cr
Revised Cost₹2026 Cr
Expenditure₹462 Cr
Original End Date09/03/2027
Revised Date09/03/2027

Project Intelligence

Project is within original budget of ₹2026 Cr — no cost escalation recorded.

Expenditure stands at ₹462 Cr, which is 22.8% of the revised project cost.

Remaining budget: ₹1564 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 4-Lane with paved shoulder Agartala bypass Western side, length 25.402 km connecting NH-8 near Amtali to NH-108B near Lembuchhera in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2026.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 4-Lane with paved shoulder Agartala bypass Western side, length "?
Construction of 4-Lane with paved shoulder Agartala bypass Western side, length 25.402 km connecting NH-8 near Amtali to NH-108B near Lembuchhera in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹2026 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹2026 Cr has not been significantly revised. Expenditure: ₹462 Cr (22.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 4-Lane with paved shoulder Agartala bypass W is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618417. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Lane with paved shoulder Agartala bypass W is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.