Construction of 4-Lane with paved shoulder Agartala bypass Western side, length 25.402 km connecting NH-8 near Amtali to NH-108B near Lembuchhera in the state of Tripura on EPC basis under NHO-NE
Original Cost
₹2026 Cr
Baseline estimate
Revised Cost
₹2026 Cr
Latest approved cost
Expenditure
₹462 Cr
Spent to date
Utilization
22.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1564 Cr
Budget left
Budget Utilization
22.8%Spent
₹462 Cr
Remaining
₹1564 Cr
Total
₹2026 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/03/2027
Revised Completion
09/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2026 Cr — no cost escalation recorded.
Expenditure stands at ₹462 Cr, which is 22.8% of the revised project cost.
Remaining budget: ₹1564 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4-Lane with paved shoulder Agartala bypass Western side, length 25.402 km connecting NH-8 near Amtali to NH-108B near Lembuchhera in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2026.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4-Lane with paved shoulder Agartala bypass Western side, length "?
- Construction of 4-Lane with paved shoulder Agartala bypass Western side, length 25.402 km connecting NH-8 near Amtali to NH-108B near Lembuchhera in the state of Tripura on EPC basis under NHO-NE is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹2026 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹2026 Cr has not been significantly revised. Expenditure: ₹462 Cr (22.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4-Lane with paved shoulder Agartala bypass W is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618417. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Lane with paved shoulder Agartala bypass W is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.