Construction of 4 lane ROB with approaches in lieu of LC No. RV-172 at km 176.00 of NH-201 present NH-26 at Kesinga including land acquisition in the state of Odisha on EPC mode under Annual Plan 2021-22
Original Cost
₹324 Cr
Baseline estimate
Revised Cost
₹324 Cr
Latest approved cost
Expenditure
₹162 Cr
Spent to date
Utilization
49.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹162 Cr
Budget left
Budget Utilization
49.9%Spent
₹162 Cr
Remaining
₹162 Cr
Total
₹324 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/05/2025
Revised Completion
20/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹324 Cr — no cost escalation recorded.
Expenditure stands at ₹162 Cr, which is 49.9% of the revised project cost.
Remaining budget: ₹162 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4 lane ROB with approaches in lieu of LC No. RV-172 at km 176.00 of NH-201 present NH-26 at Kesinga including land acquisition in the state of Odisha on EPC mode under Annual Plan 2021-22 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹324.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4 lane ROB with approaches in lieu of LC No. RV-172 at km 176.00"?
- Construction of 4 lane ROB with approaches in lieu of LC No. RV-172 at km 176.00 of NH-201 present NH-26 at Kesinga including land acquisition in the state of Odisha on EPC mode under Annual Plan 2021-22 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹324 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹324 Cr has not been significantly revised. Expenditure: ₹162 Cr (49.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4 lane ROB with approaches in lieu of LC No. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617905. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4 lane ROB with approaches in lieu of LC No. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.