Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Construction of 4-Lane Panchgram Bypass from Desig
Roads & HighwaysIPM · Central Project +7.8% Overrun#618308

Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 Old NH-53 at Kalinagar Pt.-I Village to Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Package-2

Ministry of Road Transport & HighwaysAssamData: 2026-05
Revised Cost: ₹729 CrUtilization: 0.0%Overrun: +₹53 Cr

Original Cost

₹676 Cr

Baseline estimate

+8%

Revised Cost

₹729 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Escalated

Cost Status

+7.8%

+₹53 Cr increase

Remaining

₹729 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹729 Cr

Total

₹729 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹676 Cr

Revised Cost

₹729 Cr

Increase

+₹53 Cr

Escalation

+7.8%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/02/2027

Revised Completion

09/02/2027

Completed

Project Details

Project Code618308
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAssam
Data Month2026-05

Financial & Timeline

Original Cost₹676 Cr
Revised Cost₹729 Cr
Expenditure₹0 Cr
Original End Date09/02/2027
Revised Date09/02/2027

Project Intelligence

Cost has increased by ₹53 Cr (7.8%) from the original estimate of ₹676 Cr.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹729 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Frequently Asked Questions

What is IPM project "Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 O"?
Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 Old NH-53 at Kalinagar Pt.-I Village to Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹676 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost was ₹676 Cr and has been revised to ₹729 Cr — a cost overrun of +7.8%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-05.
Which ministry is responsible for this project?
Construction of 4-Lane Panchgram Bypass from Design Chainage is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618308. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Lane Panchgram Bypass from Design Chainage is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview