Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 Old NH-53 at Kalinagar Pt.-I Village to Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Package-2
Original Cost
₹676 Cr
Baseline estimate
Revised Cost
₹729 Cr
Latest approved cost
Expenditure
₹358 Cr
Spent to date
Utilization
49.1%
Of revised budget
Cost Status
+7.8%
+₹53 Cr increase
Remaining
₹371 Cr
Budget left
Budget Utilization
49.1%Spent
₹358 Cr
Remaining
₹371 Cr
Total
₹729 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹676 Cr
Revised Cost
₹729 Cr
Increase
+₹53 Cr
Escalation
+7.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/02/2027
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹53 Cr (7.8%) from the original estimate of ₹676 Cr.
Expenditure stands at ₹358 Cr, which is 49.1% of the revised project cost.
Remaining budget: ₹371 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 Old NH-53 at Kalinagar Pt.-I Village to Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹676.00 Cr, later revised to ₹728.97 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 O"?
- Construction of 4-Lane Panchgram Bypass from Design Chainage km 15500 on NH-37 Old NH-53 at Kalinagar Pt.-I Village to Design Chainage km 27300 at crossing with NH-6 Old NH-44 Near Siddeswar Pt.-I Village on Silchar - Churaibari stretch in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors Silchar- Churaibari Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Assam. Original cost: ₹676 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹676 Cr and has been revised to ₹729 Cr — a cost overrun of +7.8%. Expenditure to date: ₹358 Cr (49.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4-Lane Panchgram Bypass from Design Chainage is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618308. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4-Lane Panchgram Bypass from Design Chainage is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.