Construction of 4 Lane Access Controlled Bypass for Dehradun on NH307 from Design Chainage km 0050 Jhajra on NH-07 to Design Chainage km 12220 Asharori on EPC Mode in the State of Uttarakhand under NHO
Original Cost
₹716 Cr
Baseline estimate
Revised Cost
₹337 Cr
Latest approved cost
Expenditure
₹205 Cr
Spent to date
Utilization
60.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹132 Cr
Budget left
Budget Utilization
60.7%Spent
₹205 Cr
Remaining
₹132 Cr
Total
₹337 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/04/2027
Revised Completion
23/04/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹716 Cr — no cost escalation recorded.
Expenditure stands at ₹205 Cr, which is 60.7% of the revised project cost.
Remaining budget: ₹132 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 4 Lane Access Controlled Bypass for Dehradun on NH307 from Design Chainage km 0050 Jhajra on NH-07 to Design Chainage km 12220 Asharori on EPC Mode in the State of Uttarakhand under NHO is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹716.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 4 Lane Access Controlled Bypass for Dehradun on NH307 from Desig"?
- Construction of 4 Lane Access Controlled Bypass for Dehradun on NH307 from Design Chainage km 0050 Jhajra on NH-07 to Design Chainage km 12220 Asharori on EPC Mode in the State of Uttarakhand under NHO is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹716 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹716 Cr and has been revised to ₹337 Cr — a cost overrun of -52.9%. Expenditure to date: ₹205 Cr (60.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 4 Lane Access Controlled Bypass for Dehradun is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619293. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 4 Lane Access Controlled Bypass for Dehradun is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.