Roads & HighwaysIPM · Central Project#618447

Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Helipad near Menla at Km 82000 to Menla at Km 94030 of Rhenock-Menla Spur NH-717B Package-IIIB on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim.

Ministry of Road Transport & HighwaysSikkim
Revised Cost: ₹379 CrUtilization: 63.7%

Original Cost

₹411 Cr

Baseline estimate

On budget

Revised Cost

₹379 Cr

Latest approved cost

Expenditure

₹242 Cr

Spent to date

Utilization

63.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹138 Cr

Budget left

Budget Utilization

63.7%
0%25%50%75%100%

Spent

₹242 Cr

Remaining

₹138 Cr

Total

₹379 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

24/02/2024

Revised Completion

31/05/2027

Completed

Project Details

Project Code618447
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateSikkim
Data Month2026-08

Financial Summary

Original Cost₹411 Cr
Revised Cost₹379 Cr
Expenditure₹242 Cr
Original End Date24/02/2024
Revised Date31/05/2027

Project Intelligence

Project is within original budget of ₹411 Cr — no cost escalation recorded.

Expenditure stands at ₹242 Cr, which is 63.7% of the revised project cost.

Remaining budget: ₹138 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Helipad near Menla at Km 82000 to Menla at Km 94030 of Rhenock-Menla Spur NH-717B Package-IIIB on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹411.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From He"?
Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Helipad near Menla at Km 82000 to Menla at Km 94030 of Rhenock-Menla Spur NH-717B Package-IIIB on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Sikkim. Original cost: ₹411 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹411 Cr and has been revised to ₹379 Cr — a cost overrun of -7.7%. Expenditure to date: ₹242 Cr (63.7% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 2-Laning with Paved Shoulder of New Greenfie is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618447. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Laning with Paved Shoulder of New Greenfie is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.