Roads & HighwaysIPM · Central Project#618448

Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Chochenpheri at Km 52000 to Helipad near Menla at Km 82000 of Rhenock-Menla Spur NH-717B Package-IIIA on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim.

Ministry of Road Transport & HighwaysSikkim
Revised Cost: ₹787 CrUtilization: 60.4%

Original Cost

₹817 Cr

Baseline estimate

On budget

Revised Cost

₹787 Cr

Latest approved cost

Expenditure

₹475 Cr

Spent to date

Utilization

60.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹312 Cr

Budget left

Budget Utilization

60.4%
0%25%50%75%100%

Spent

₹475 Cr

Remaining

₹312 Cr

Total

₹787 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/12/2023

Revised Completion

19/05/2027

Completed

Project Details

Project Code618448
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateSikkim
Data Month2026-08

Financial Summary

Original Cost₹817 Cr
Revised Cost₹787 Cr
Expenditure₹475 Cr
Original End Date09/12/2023
Revised Date19/05/2027

Project Intelligence

Project is within original budget of ₹817 Cr — no cost escalation recorded.

Expenditure stands at ₹475 Cr, which is 60.4% of the revised project cost.

Remaining budget: ₹312 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Chochenpheri at Km 52000 to Helipad near Menla at Km 82000 of Rhenock-Menla Spur NH-717B Package-IIIA on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹817.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Ch"?
Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Chochenpheri at Km 52000 to Helipad near Menla at Km 82000 of Rhenock-Menla Spur NH-717B Package-IIIA on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Sikkim. Original cost: ₹817 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹817 Cr and has been revised to ₹787 Cr — a cost overrun of -3.7%. Expenditure to date: ₹475 Cr (60.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 2-Laning with Paved Shoulder of New Greenfie is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618448. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Laning with Paved Shoulder of New Greenfie is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.