Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Chochenpheri at Km 52000 to Helipad near Menla at Km 82000 of Rhenock-Menla Spur NH-717B Package-IIIA on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim.
Original Cost
₹817 Cr
Baseline estimate
Revised Cost
₹787 Cr
Latest approved cost
Expenditure
₹475 Cr
Spent to date
Utilization
60.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹312 Cr
Budget left
Budget Utilization
60.4%Spent
₹475 Cr
Remaining
₹312 Cr
Total
₹787 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/12/2023
Revised Completion
19/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹817 Cr — no cost escalation recorded.
Expenditure stands at ₹475 Cr, which is 60.4% of the revised project cost.
Remaining budget: ₹312 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Chochenpheri at Km 52000 to Helipad near Menla at Km 82000 of Rhenock-Menla Spur NH-717B Package-IIIA on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹817.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Ch"?
- Construction of 2-Laning with Paved Shoulder of New Greenfield Alignment From Chochenpheri at Km 52000 to Helipad near Menla at Km 82000 of Rhenock-Menla Spur NH-717B Package-IIIA on EPC Basis under SARDP-NE Phase 'A' in the State of Sikkim. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Sikkim. Original cost: ₹817 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹817 Cr and has been revised to ₹787 Cr — a cost overrun of -3.7%. Expenditure to date: ₹475 Cr (60.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2-Laning with Paved Shoulder of New Greenfie is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618448. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Laning with Paved Shoulder of New Greenfie is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.