Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 31.430 at Old Tamenglong to km 43.480 ending near Phelong on EPC Mode Package-3
Original Cost
₹234 Cr
Baseline estimate
Revised Cost
₹234 Cr
Latest approved cost
Expenditure
₹201 Cr
Spent to date
Utilization
86.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹33 Cr
Budget left
Budget Utilization
86.0%Spent
₹201 Cr
Remaining
₹33 Cr
Total
₹234 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/12/2022
Revised Completion
15/04/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹234 Cr — no cost escalation recorded.
Expenditure stands at ₹201 Cr, which is 86.0% of the revised project cost.
Remaining budget: ₹33 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 31.430 at Old Tamenglong to km 43.480 ending near Phelong on EPC Mode Package-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹234.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in th"?
- Construction of 2 -Lane with paved shoulders road from Tamenglong to Mahur in the state of Manipur from km 31.430 at Old Tamenglong to km 43.480 ending near Phelong on EPC Mode Package-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹234 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹234 Cr has not been significantly revised. Expenditure: ₹201 Cr (86.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2 -Lane with paved shoulders road from Tamen is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618356. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2 -Lane with paved shoulders road from Tamen is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.