Construction of 2- Lane with paved shoulder from km 56.45 Dharampur More to 93.050 Pakur of NH-333A in the State of Jharkhand on EPC mode
Original Cost
₹256 Cr
Baseline estimate
Revised Cost
₹256 Cr
Latest approved cost
Expenditure
₹33 Cr
Spent to date
Utilization
12.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹223 Cr
Budget left
Budget Utilization
12.8%Spent
₹33 Cr
Remaining
₹223 Cr
Total
₹256 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/05/2027
Revised Completion
03/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹256 Cr — no cost escalation recorded.
Expenditure stands at ₹33 Cr, which is 12.8% of the revised project cost.
Remaining budget: ₹223 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction of 2- Lane with paved shoulder from km 56.45 Dharampur More to 93.050 Pakur of NH-333A in the State of Jharkhand on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹256.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction of 2- Lane with paved shoulder from km 56.45 Dharampur More to 93.0"?
- Construction of 2- Lane with paved shoulder from km 56.45 Dharampur More to 93.050 Pakur of NH-333A in the State of Jharkhand on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jharkhand. Original cost: ₹256 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹256 Cr has not been significantly revised. Expenditure: ₹33 Cr (12.8% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction of 2- Lane with paved shoulder from km 56.45 Dh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618127. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2- Lane with paved shoulder from km 56.45 Dh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.