Roads & HighwaysIPM · Central Project#618423

Construction of 2-Lane with hard shoulders of Merangkong-Tamlu-Mon MTM Road from existing Km 20.456 to Km 41.065 Design Km. 20 to Km. 40.0 Design Length-20.000 Km in the State of Nagaland under SARDP-NE Phase-A Pkg-2 Balance work

Ministry of Road Transport & HighwaysNagaland
Revised Cost: ₹216 CrUtilization: 80.1%

Original Cost

₹216 Cr

Baseline estimate

On budget

Revised Cost

₹216 Cr

Latest approved cost

Expenditure

₹173 Cr

Spent to date

Utilization

80.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹43 Cr

Budget left

Budget Utilization

80.1%
0%25%50%75%100%

Spent

₹173 Cr

Remaining

₹43 Cr

Total

₹216 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

21/08/2025

Revised Completion

13/03/2026

Completed

Project Details

Project Code618423
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateNagaland
Data Month2026-08

Financial Summary

Original Cost₹216 Cr
Revised Cost₹216 Cr
Expenditure₹173 Cr
Original End Date21/08/2025
Revised Date13/03/2026

Project Intelligence

Project is within original budget of ₹216 Cr — no cost escalation recorded.

Expenditure stands at ₹173 Cr, which is 80.1% of the revised project cost.

Remaining budget: ₹43 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-Lane with hard shoulders of Merangkong-Tamlu-Mon MTM Road from existing Km 20.456 to Km 41.065 Design Km. 20 to Km. 40.0 Design Length-20.000 Km in the State of Nagaland under SARDP-NE Phase-A Pkg-2 Balance work is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹216.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-Lane with hard shoulders of Merangkong-Tamlu-Mon MTM Road from"?
Construction of 2-Lane with hard shoulders of Merangkong-Tamlu-Mon MTM Road from existing Km 20.456 to Km 41.065 Design Km. 20 to Km. 40.0 Design Length-20.000 Km in the State of Nagaland under SARDP-NE Phase-A Pkg-2 Balance work is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Nagaland. Original cost: ₹216 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹216 Cr has not been significantly revised. Expenditure: ₹173 Cr (80.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 2-Lane with hard shoulders of Merangkong-Tam is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618423. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-Lane with hard shoulders of Merangkong-Tam is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.