Roads & HighwaysIPM · Central Project#617892

Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 Package-5 on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE [Job No SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116]

Ministry of Road Transport & HighwaysArunachal Pradesh
Revised Cost: ₹451 CrUtilization: 89.5%

Original Cost

₹451 Cr

Baseline estimate

On budget

Revised Cost

₹451 Cr

Latest approved cost

Expenditure

₹404 Cr

Spent to date

Utilization

89.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹47 Cr

Budget left

Budget Utilization

89.5%
0%25%50%75%100%

Spent

₹404 Cr

Remaining

₹47 Cr

Total

₹451 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/11/2023

Revised Completion

31/10/2026

Completed

Project Details

Project Code617892
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateArunachal Pradesh
Data Month2026-08

Financial Summary

Original Cost₹451 Cr
Revised Cost₹451 Cr
Expenditure₹404 Cr
Original End Date18/11/2023
Revised Date31/10/2026

Project Intelligence

Project is within original budget of ₹451 Cr — no cost escalation recorded.

Expenditure stands at ₹404 Cr, which is 89.5% of the revised project cost.

Remaining budget: ₹47 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 Package-5 on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE [Job No SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹451.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 t"?
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 Package-5 on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE [Job No SARDP-NE/P-P/Pkg-A/NH-13/Ar.Pr./PWD/2018-19/116] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Arunachal Pradesh. Original cost: ₹451 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹451 Cr has not been significantly revised. Expenditure: ₹404 Cr (89.5% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction of 2-lane road of Potin to Pangin section of NH is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617892. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction of 2-lane road of Potin to Pangin section of NH is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.