Roads & HighwaysIPM · Central Project#618391

Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones and 01 No. Bridge from Ch. 450.00 to Ch. 468.00 18 Km. Length on NH-07 Package-III

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹250 CrUtilization: 44.9%

Original Cost

₹250 Cr

Baseline estimate

On budget

Revised Cost

₹250 Cr

Latest approved cost

Expenditure

₹112 Cr

Spent to date

Utilization

44.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹138 Cr

Budget left

Budget Utilization

44.9%
0%25%50%75%100%

Spent

₹112 Cr

Remaining

₹138 Cr

Total

₹250 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

05/12/2025

Revised Completion

24/02/2027

Completed

Project Details

Project Code618391
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹250 Cr
Revised Cost₹250 Cr
Expenditure₹112 Cr
Original End Date05/12/2025
Revised Date24/02/2027

Project Intelligence

Project is within original budget of ₹250 Cr — no cost escalation recorded.

Expenditure stands at ₹112 Cr, which is 44.9% of the revised project cost.

Remaining budget: ₹138 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones and 01 No. Bridge from Ch. 450.00 to Ch. 468.00 18 Km. Length on NH-07 Package-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹250.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones "?
Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones and 01 No. Bridge from Ch. 450.00 to Ch. 468.00 18 Km. Length on NH-07 Package-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹250 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹250 Cr has not been significantly revised. Expenditure: ₹112 Cr (44.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Construction for Mitigation Measures of 5 Nos. Landslides, 0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618391. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction for Mitigation Measures of 5 Nos. Landslides, 0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.