Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones and 01 No. Bridge from Ch. 450.00 to Ch. 468.00 18 Km. Length on NH-07 Package-III
Original Cost
₹250 Cr
Baseline estimate
Revised Cost
₹250 Cr
Latest approved cost
Expenditure
₹112 Cr
Spent to date
Utilization
44.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹138 Cr
Budget left
Budget Utilization
44.9%Spent
₹112 Cr
Remaining
₹138 Cr
Total
₹250 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/12/2025
Revised Completion
24/02/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹250 Cr — no cost escalation recorded.
Expenditure stands at ₹112 Cr, which is 44.9% of the revised project cost.
Remaining budget: ₹138 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones and 01 No. Bridge from Ch. 450.00 to Ch. 468.00 18 Km. Length on NH-07 Package-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹250.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones "?
- Construction for Mitigation Measures of 5 Nos. Landslides, 05 No. Sinking Zones and 01 No. Bridge from Ch. 450.00 to Ch. 468.00 18 Km. Length on NH-07 Package-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹250 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹250 Cr has not been significantly revised. Expenditure: ₹112 Cr (44.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Construction for Mitigation Measures of 5 Nos. Landslides, 0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618391. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction for Mitigation Measures of 5 Nos. Landslides, 0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.