Roads & HighwaysIPM · Central Project#618393

Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zones and 1 No. of Minor Bridge in between at Ch. Km 368.00 to Km 433.00 on NH-07 on EPC Mode in Uttarakhand Package-1

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹217 CrUtilization: 54.3%

Original Cost

₹217 Cr

Baseline estimate

On budget

Revised Cost

₹217 Cr

Latest approved cost

Expenditure

₹118 Cr

Spent to date

Utilization

54.3%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹99 Cr

Budget left

Budget Utilization

54.3%
0%25%50%75%100%

Spent

₹118 Cr

Remaining

₹99 Cr

Total

₹217 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

05/12/2025

Revised Completion

29/02/2024

Completed

Project Details

Project Code618393
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-07

Financial Summary

Original Cost₹217 Cr
Revised Cost₹217 Cr
Expenditure₹118 Cr
Original End Date05/12/2025
Revised Date29/02/2024

Project Intelligence

Project is within original budget of ₹217 Cr — no cost escalation recorded.

Expenditure stands at ₹118 Cr, which is 54.3% of the revised project cost.

Remaining budget: ₹99 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zones and 1 No. of Minor Bridge in between at Ch. Km 368.00 to Km 433.00 on NH-07 on EPC Mode in Uttarakhand Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹217.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zone"?
Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zones and 1 No. of Minor Bridge in between at Ch. Km 368.00 to Km 433.00 on NH-07 on EPC Mode in Uttarakhand Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹217 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹217 Cr has not been significantly revised. Expenditure: ₹118 Cr (54.3% of cost). Data as of 2026-07.
QWhich ministry is responsible for this project?
Construction for Mitigation Measures of 10 Nos. Landslides, is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618393. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction for Mitigation Measures of 10 Nos. Landslides, is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.