Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zones and 1 No. of Minor Bridge in between at Ch. Km 368.00 to Km 433.00 on NH-07 on EPC Mode in Uttarakhand Package-1
Original Cost
₹217 Cr
Baseline estimate
Revised Cost
₹217 Cr
Latest approved cost
Expenditure
₹118 Cr
Spent to date
Utilization
54.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹99 Cr
Budget left
Budget Utilization
54.3%Spent
₹118 Cr
Remaining
₹99 Cr
Total
₹217 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/12/2025
Revised Completion
29/02/2024
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹217 Cr — no cost escalation recorded.
Expenditure stands at ₹118 Cr, which is 54.3% of the revised project cost.
Remaining budget: ₹99 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zones and 1 No. of Minor Bridge in between at Ch. Km 368.00 to Km 433.00 on NH-07 on EPC Mode in Uttarakhand Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹217.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zone"?
- Construction for Mitigation Measures of 10 Nos. Landslides, 01 No. Sinking Zones and 1 No. of Minor Bridge in between at Ch. Km 368.00 to Km 433.00 on NH-07 on EPC Mode in Uttarakhand Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹217 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹217 Cr has not been significantly revised. Expenditure: ₹118 Cr (54.3% of cost). Data as of 2026-07.
- QWhich ministry is responsible for this project?
- Construction for Mitigation Measures of 10 Nos. Landslides, is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618393. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Construction for Mitigation Measures of 10 Nos. Landslides, is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.