Capacity Augmentation in the stretch of Pimpri Sado Vadape section of NH848 Km. 460900 to Km. 537000 by Construction of Slip/Service Road on either side at various locations total length 25.140 Km LHSRHS, Flyover 2 x 25m at Borivali Junction Km. 528550 & LVUP 1 x 15m at Sherekarpada Km. 528800
Original Cost
₹372 Cr
Baseline estimate
Revised Cost
₹372 Cr
Latest approved cost
Expenditure
₹2 Cr
Spent to date
Utilization
0.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹371 Cr
Budget left
Budget Utilization
0.4%Spent
₹2 Cr
Remaining
₹371 Cr
Total
₹372 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/10/2027
Revised Completion
27/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹372 Cr — no cost escalation recorded.
Expenditure stands at ₹2 Cr, which is 0.4% of the revised project cost.
Remaining budget: ₹371 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Capacity Augmentation in the stretch of Pimpri Sado Vadape section of NH848 Km. 460900 to Km. 537000 by Construction of Slip/Service Road on either side at various locations total length 25.140 Km LHSRHS, Flyover 2 x 25m at Borivali Junction Km. 528550 & LVUP 1 x 15m at Sherekarpada Km. 528800 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹372.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Capacity Augmentation in the stretch of Pimpri Sado Vadape section of NH848 Km."?
- Capacity Augmentation in the stretch of Pimpri Sado Vadape section of NH848 Km. 460900 to Km. 537000 by Construction of Slip/Service Road on either side at various locations total length 25.140 Km LHSRHS, Flyover 2 x 25m at Borivali Junction Km. 528550 & LVUP 1 x 15m at Sherekarpada Km. 528800 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹372 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹372 Cr has not been significantly revised. Expenditure: ₹2 Cr (0.4% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Capacity Augmentation in the stretch of Pimpri Sado Vadape is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619204. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Capacity Augmentation in the stretch of Pimpri Sado Vadape is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.