Roads & HighwaysIPM · Central Project#619039

Balance Works of Rehabilitation and Up gradation of NH-43 New NH-30 from Krn 162120 to Krn 173500 Length 11.380 Km. Keshkal Bypass 4-Lane with Paved shoulder in the State Of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction EPC Basis

Ministry of Road Transport & HighwaysChhattisgarh
Revised Cost: ₹308 CrUtilization: 3.5%

Original Cost

₹308 Cr

Baseline estimate

On budget

Revised Cost

₹308 Cr

Latest approved cost

Expenditure

₹11 Cr

Spent to date

Utilization

3.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹297 Cr

Budget left

Budget Utilization

3.5%
0%25%50%75%100%

Spent

₹11 Cr

Remaining

₹297 Cr

Total

₹308 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

10/06/2028

Revised Completion

Completed

Project Details

Project Code619039
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateChhattisgarh
Data Month2026-08

Financial Summary

Original Cost₹308 Cr
Revised Cost₹308 Cr
Expenditure₹11 Cr
Original End Date10/06/2028
Revised DateN/A

Project Intelligence

Project is within original budget of ₹308 Cr — no cost escalation recorded.

Expenditure stands at ₹11 Cr, which is 3.5% of the revised project cost.

Remaining budget: ₹297 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Balance Works of Rehabilitation and Up gradation of NH-43 New NH-30 from Krn 162120 to Krn 173500 Length 11.380 Km. Keshkal Bypass 4-Lane with Paved shoulder in the State Of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction EPC Basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹308.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Balance Works of Rehabilitation and Up gradation of NH-43 New NH-30 from Krn 162"?
Balance Works of Rehabilitation and Up gradation of NH-43 New NH-30 from Krn 162120 to Krn 173500 Length 11.380 Km. Keshkal Bypass 4-Lane with Paved shoulder in the State Of Chhattisgarh under NHDP-IV through Engineering, Procurement & Construction EPC Basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Chhattisgarh. Original cost: ₹308 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹308 Cr has not been significantly revised. Expenditure: ₹11 Cr (3.5% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Balance Works of Rehabilitation and Up gradation of NH-43 Ne is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619039. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance Works of Rehabilitation and Up gradation of NH-43 Ne is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.