Balance works of 4 lane divided carriageway of Missing Link section of NH-39 Rewa Bypass from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH 9 design length 13.100 km on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh
Original Cost
₹355 Cr
Baseline estimate
Revised Cost
₹355 Cr
Latest approved cost
Expenditure
₹264 Cr
Spent to date
Utilization
74.4%
Of revised budget
Cost Status
+0.1%
+₹0 Cr increase
Remaining
₹91 Cr
Budget left
Budget Utilization
74.4%Spent
₹264 Cr
Remaining
₹91 Cr
Total
₹355 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹355 Cr
Revised Cost
₹355 Cr
Increase
+₹0 Cr
Escalation
+0.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/04/2026
Revised Completion
31/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹0 Cr (0.1%) from the original estimate of ₹355 Cr.
Expenditure stands at ₹264 Cr, which is 74.4% of the revised project cost.
Remaining budget: ₹91 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance works of 4 lane divided carriageway of Missing Link section of NH-39 Rewa Bypass from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH 9 design length 13.100 km on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹355.00 Cr, later revised to ₹355.36 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance works of 4 lane divided carriageway of Missing Link section of NH-39 Rew"?
- Balance works of 4 lane divided carriageway of Missing Link section of NH-39 Rewa Bypass from junction with NH 30 near Bela to Junction with MPRDC ring road near Silpara on SH 9 design length 13.100 km on EPC Mode under Bharatmala Pariyojana in the State of Madhya Pradesh is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹355 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹355 Cr and has been revised to ₹355 Cr — a cost overrun of +0.1%. Expenditure to date: ₹264 Cr (74.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance works of 4 lane divided carriageway of Missing Link is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618784. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance works of 4 lane divided carriageway of Missing Link is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.