Roads & HighwaysIPM · Central Project#618349

Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118850 to km 130000 Package-4A in the State of Manipur on EPC Mode

Ministry of Road Transport & HighwaysManipur
Revised Cost: ₹204 CrUtilization: 56.8%

Original Cost

₹204 Cr

Baseline estimate

On budget

Revised Cost

₹204 Cr

Latest approved cost

Expenditure

₹116 Cr

Spent to date

Utilization

56.8%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹88 Cr

Budget left

Budget Utilization

56.8%
0%25%50%75%100%

Spent

₹116 Cr

Remaining

₹88 Cr

Total

₹204 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

29/08/2026

Revised Completion

12/11/2026

Completed

Project Details

Project Code618349
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateManipur
Data Month2026-08

Financial Summary

Original Cost₹204 Cr
Revised Cost₹204 Cr
Expenditure₹116 Cr
Original End Date29/08/2026
Revised Date12/11/2026

Project Intelligence

Project is within original budget of ₹204 Cr — no cost escalation recorded.

Expenditure stands at ₹116 Cr, which is 56.8% of the revised project cost.

Remaining budget: ₹88 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118850 to km 130000 Package-4A in the State of Manipur on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹204.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tu"?
Balance work of Widening to 2 Two lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118850 to km 130000 Package-4A in the State of Manipur on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹204 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹204 Cr has not been significantly revised. Expenditure: ₹116 Cr (56.8% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Balance work of Widening to 2 Two lane with hard shoulder of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618349. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of Widening to 2 Two lane with hard shoulder of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.