Balance work of NH-66 from design Km 84/00 to Km 87/100 Indapur Bypass and Km 91/600 to Km 99/100 Mangaon Bypass to four lane with paved shoulder in State of Maharashtra under NHO on EPC Mode.
Original Cost
₹354 Cr
Baseline estimate
Revised Cost
₹354 Cr
Latest approved cost
Expenditure
₹156 Cr
Spent to date
Utilization
44.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹198 Cr
Budget left
Budget Utilization
44.2%Spent
₹156 Cr
Remaining
₹198 Cr
Total
₹354 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/04/2027
Revised Completion
08/04/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹354 Cr — no cost escalation recorded.
Expenditure stands at ₹156 Cr, which is 44.2% of the revised project cost.
Remaining budget: ₹198 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Balance work of NH-66 from design Km 84/00 to Km 87/100 Indapur Bypass and Km 91/600 to Km 99/100 Mangaon Bypass to four lane with paved shoulder in State of Maharashtra under NHO on EPC Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹354.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Balance work of NH-66 from design Km 84/00 to Km 87/100 Indapur Bypass and Km 91"?
- Balance work of NH-66 from design Km 84/00 to Km 87/100 Indapur Bypass and Km 91/600 to Km 99/100 Mangaon Bypass to four lane with paved shoulder in State of Maharashtra under NHO on EPC Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹354 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹354 Cr has not been significantly revised. Expenditure: ₹156 Cr (44.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Balance work of NH-66 from design Km 84/00 to Km 87/100 Inda is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617945. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work of NH-66 from design Km 84/00 to Km 87/100 Inda is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.