Roads & HighwaysIPM · Central Project#619304

Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 82/400 to Km 187/99 Design Length 105.59 Km of NH-39 Old NH-75E to four lane with paved shoulder in the State of Madhya Pradesh on Item Rate Mode.

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹568 CrUtilization: 0.7%

Original Cost

₹568 Cr

Baseline estimate

On budget

Revised Cost

₹568 Cr

Latest approved cost

Expenditure

₹4 Cr

Spent to date

Utilization

0.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹564 Cr

Budget left

Budget Utilization

0.7%
0%25%50%75%100%

Spent

₹4 Cr

Remaining

₹564 Cr

Total

₹568 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

08/05/2028

Revised Completion

08/05/2028

Completed

Project Details

Project Code619304
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹568 Cr
Revised Cost₹568 Cr
Expenditure₹4 Cr
Original End Date08/05/2028
Revised Date08/05/2028

Project Intelligence

Project is within original budget of ₹568 Cr — no cost escalation recorded.

Expenditure stands at ₹4 Cr, which is 0.7% of the revised project cost.

Remaining budget: ₹564 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 82/400 to Km 187/99 Design Length 105.59 Km of NH-39 Old NH-75E to four lane with paved shoulder in the State of Madhya Pradesh on Item Rate Mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹568.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km"?
Balance work for rehabilitation and upgradation of Sidhi -Singrauli Road from Km 82/400 to Km 187/99 Design Length 105.59 Km of NH-39 Old NH-75E to four lane with paved shoulder in the State of Madhya Pradesh on Item Rate Mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹568 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹568 Cr has not been significantly revised. Expenditure: ₹4 Cr (0.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Balance work for rehabilitation and upgradation of Sidhi -Si is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619304. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Balance work for rehabilitation and upgradation of Sidhi -Si is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.