Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BiharInfraTalesBIHARINFRATALES
DashboardTenderCensusMP FundCabinetEC MonitoringAirportsTownshipsLitigation
  1. BiharInfraTales
  2. /IPM Dashboard
  3. /Access Controlled Highway of 4 Lane with Paved Sho
Roads & HighwaysIPM · Central Project#619161

Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design Chainage Km 1756 to TN/AP Broder Design Chainage Km 6151 of NH-716 Chennai-Tirupati Package-1

Ministry of Road Transport & HighwaysTamil NaduData: 2026-05
Revised Cost: ₹1248 CrUtilization: 10.7%

Original Cost

₹1376 Cr

Baseline estimate

On Budget

Revised Cost

₹1248 Cr

Latest approved cost

Expenditure

₹134 Cr

Spent to date

Utilization

10.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1114 Cr

Budget left

Budget Utilization

10.7%
0%25%50%75%100%

Spent

₹134 Cr

Remaining

₹1114 Cr

Total

₹1248 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

27/12/2026

Revised Completion

31/03/2027

Completed

Project Details

Project Code619161
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTamil Nadu
Data Month2026-05

Financial & Timeline

Original Cost₹1376 Cr
Revised Cost₹1248 Cr
Expenditure₹134 Cr
Original End Date27/12/2026
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹1376 Cr — no cost escalation recorded.

Expenditure stands at ₹134 Cr, which is 10.7% of the revised project cost.

Remaining budget: ₹1114 Cr. Project is tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Frequently Asked Questions

What is IPM project "Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design "?
Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design Chainage Km 1756 to TN/AP Broder Design Chainage Km 6151 of NH-716 Chennai-Tirupati Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tamil Nadu. Original cost: ₹1376 Cr.
What is the cost overrun for this Bihar IPM project?
The original cost was ₹1376 Cr and has been revised to ₹1248 Cr — a cost overrun of -9.3%. Expenditure to date: ₹134 Cr (10.7% of revised cost). Data as of 2026-05.
Which ministry is responsible for this project?
Access Controlled Highway of 4 Lane with Paved Shoulders fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619161. Bihar is one of the states tracked under the central IPM dashboard for this project.
What is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Access Controlled Highway of 4 Lane with Paved Shoulders fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.

Related Resources

IPM

IPM Central Project Dashboard

All central infrastructure projects in Bihar

Projects

Bihar State Projects

State-funded infrastructure project tracker

NHAI

NHAI Drone Tracker

Real-time NHAI highway construction monitoring

Railway

Bihar Railway Projects

Railway infrastructure project tracker

RCD

Bihar RCD PMIS

State road and bridge project tracker

Tenders

Bihar Government Tenders

Procurement notices for infrastructure projects

Cabinet

Bihar Cabinet Decisions

Policy approvals for infrastructure

EC

EC & Forest Clearances

Environmental clearances for Bihar projects

Upcoming

Upcoming Bihar Projects

Infrastructure pipeline and future projects

Districts

Bihar District Data

District demographics and infrastructure overview