Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design Chainage Km 1756 to TN/AP Broder Design Chainage Km 6151 of NH-716 Chennai-Tirupati Package-1
Original Cost
₹1376 Cr
Baseline estimate
Revised Cost
₹1248 Cr
Latest approved cost
Expenditure
₹182 Cr
Spent to date
Utilization
14.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1066 Cr
Budget left
Budget Utilization
14.6%Spent
₹182 Cr
Remaining
₹1066 Cr
Total
₹1248 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/12/2026
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1376 Cr — no cost escalation recorded.
Expenditure stands at ₹182 Cr, which is 14.6% of the revised project cost.
Remaining budget: ₹1066 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design Chainage Km 1756 to TN/AP Broder Design Chainage Km 6151 of NH-716 Chennai-Tirupati Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1376.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design "?
- Access Controlled Highway of 4 Lane with Paved Shoulders from Tiruvallur Design Chainage Km 1756 to TN/AP Broder Design Chainage Km 6151 of NH-716 Chennai-Tirupati Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tamil Nadu. Original cost: ₹1376 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1376 Cr and has been revised to ₹1248 Cr — a cost overrun of -9.3%. Expenditure to date: ₹182 Cr (14.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Access Controlled Highway of 4 Lane with Paved Shoulders fro is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619161. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Access Controlled Highway of 4 Lane with Paved Shoulders fro is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.