6L Flyover including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul Sambalpur Section of NH-42 New NH-55 Km.202.533
Original Cost
₹151 Cr
Baseline estimate
Revised Cost
₹106 Cr
Latest approved cost
Expenditure
₹106 Cr
Spent to date
Utilization
99.8%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹0 Cr
Budget left
Budget Utilization
99.8%Spent
₹106 Cr
Remaining
₹0 Cr
Total
₹106 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
20/06/2026
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹151 Cr — no cost escalation recorded.
Expenditure stands at ₹106 Cr, which is 99.8% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L Flyover including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul Sambalpur Section of NH-42 New NH-55 Km.202.533 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹151.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L Flyover including RE Wall approaches with Flexible Pavement in the Elephant C"?
- 6L Flyover including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul Sambalpur Section of NH-42 New NH-55 Km.202.533 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹151 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹151 Cr and has been revised to ₹106 Cr — a cost overrun of -29.6%. Expenditure to date: ₹106 Cr (99.8% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L Flyover including RE Wall approaches with Flexible Paveme is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618704. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Flyover including RE Wall approaches with Flexible Paveme is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.