Roads & HighwaysIPM · Central Project#618805

6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH516C

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹977 CrUtilization: 16.0%

Original Cost

₹977 Cr

Baseline estimate

On budget

Revised Cost

₹977 Cr

Latest approved cost

Expenditure

₹157 Cr

Spent to date

Utilization

16.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹820 Cr

Budget left

Budget Utilization

16.0%
0%25%50%75%100%

Spent

₹157 Cr

Remaining

₹820 Cr

Total

₹977 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

13/02/2028

Revised Completion

12/02/2028

Completed

Project Details

Project Code618805
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹977 Cr
Revised Cost₹977 Cr
Expenditure₹157 Cr
Original End Date13/02/2028
Revised Date12/02/2028

Project Intelligence

Project is within original budget of ₹977 Cr — no cost escalation recorded.

Expenditure stands at ₹157 Cr, which is 16.0% of the revised project cost.

Remaining budget: ₹820 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH516C is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹977.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH516C"?
6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH516C is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹977 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹977 Cr has not been significantly revised. Expenditure: ₹157 Cr (16.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH5 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618805. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Connectivity to Port Road from Sabbavaram Sheelanagar-NH5 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.