6L access controlled Highway from Km 40080 to Km 86513 Mator to Barodameo Section
Original Cost
₹2010 Cr
Baseline estimate
Revised Cost
₹1566 Cr
Latest approved cost
Expenditure
₹724 Cr
Spent to date
Utilization
46.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹842 Cr
Budget left
Budget Utilization
46.2%Spent
₹724 Cr
Remaining
₹842 Cr
Total
₹1566 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/03/2026
Revised Completion
30/06/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2010 Cr — no cost escalation recorded.
Expenditure stands at ₹724 Cr, which is 46.2% of the revised project cost.
Remaining budget: ₹842 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L access controlled Highway from Km 40080 to Km 86513 Mator to Barodameo Section is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2010.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L access controlled Highway from Km 40080 to Km 86513 Mator to Barodameo Sectio"?
- 6L access controlled Highway from Km 40080 to Km 86513 Mator to Barodameo Section is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Rajasthan. Original cost: ₹2010 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2010 Cr and has been revised to ₹1566 Cr — a cost overrun of -22.1%. Expenditure to date: ₹724 Cr (46.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L access controlled Highway from Km 40080 to Km 86513 Mator is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618757. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L access controlled Highway from Km 40080 to Km 86513 Mator is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.