6L Access Controlled Greenfield Highway from Polavaram Ch. 260000 to Marripudi Ch. 285500 of [NH-544G]Package-12
Original Cost
₹747 Cr
Baseline estimate
Revised Cost
₹627 Cr
Latest approved cost
Expenditure
₹251 Cr
Spent to date
Utilization
40.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹376 Cr
Budget left
Budget Utilization
40.0%Spent
₹251 Cr
Remaining
₹376 Cr
Total
₹627 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
10/02/2026
Revised Completion
31/05/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹747 Cr — no cost escalation recorded.
Expenditure stands at ₹251 Cr, which is 40.0% of the revised project cost.
Remaining budget: ₹376 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L Access Controlled Greenfield Highway from Polavaram Ch. 260000 to Marripudi Ch. 285500 of [NH-544G]Package-12 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹747.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L Access Controlled Greenfield Highway from Polavaram Ch. 260000 to Marripudi C"?
- 6L Access Controlled Greenfield Highway from Polavaram Ch. 260000 to Marripudi Ch. 285500 of [NH-544G]Package-12 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹747 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹747 Cr and has been revised to ₹627 Cr — a cost overrun of -16.1%. Expenditure to date: ₹251 Cr (40.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L Access Controlled Greenfield Highway from Polavaram Ch. 2 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619124. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L Access Controlled Greenfield Highway from Polavaram Ch. 2 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.