6L access control Greenfield highway of Vill-Khyawari to Vill-Latifpur at Saharanpur Bypass from Km. 82.000 to Km. 119.790 Pkg-4
Original Cost
₹1428 Cr
Baseline estimate
Revised Cost
₹1439 Cr
Latest approved cost
Expenditure
₹1396 Cr
Spent to date
Utilization
97.0%
Of revised budget
Cost Status
+0.8%
+₹11 Cr increase
Remaining
₹43 Cr
Budget left
Budget Utilization
97.0%Spent
₹1396 Cr
Remaining
₹43 Cr
Total
₹1439 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1428 Cr
Revised Cost
₹1439 Cr
Increase
+₹11 Cr
Escalation
+0.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/09/2024
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹11 Cr (0.8%) from the original estimate of ₹1428 Cr.
Expenditure stands at ₹1396 Cr, which is 97.0% of the revised project cost.
Remaining budget: ₹43 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
6L access control Greenfield highway of Vill-Khyawari to Vill-Latifpur at Saharanpur Bypass from Km. 82.000 to Km. 119.790 Pkg-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1428.00 Cr, later revised to ₹1439.35 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "6L access control Greenfield highway of Vill-Khyawari to Vill-Latifpur at Sahara"?
- 6L access control Greenfield highway of Vill-Khyawari to Vill-Latifpur at Saharanpur Bypass from Km. 82.000 to Km. 119.790 Pkg-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1428 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1428 Cr and has been revised to ₹1439 Cr — a cost overrun of +0.8%. Expenditure to date: ₹1396 Cr (97.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 6L access control Greenfield highway of Vill-Khyawari to Vil is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618968. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 6L access control Greenfield highway of Vill-Khyawari to Vil is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.