Roads & HighwaysIPM · Central Project +2.9% overrun#618919

4L PS from Mandlem Existing Km. 38.000/Design Km.30.600 to Atmakur Existing Km.73.000/Design Km 66.115 of NH340C Package2

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹913 CrUtilization: 41.0%Overrun: +₹26 Cr

Original Cost

₹887 Cr

Baseline estimate

+3% overrun

Revised Cost

₹913 Cr

Latest approved cost

Expenditure

₹374 Cr

Spent to date

Utilization

41.0%

Of revised budget

Escalated

Cost Status

+2.9%

+₹26 Cr increase

Remaining

₹539 Cr

Budget left

Budget Utilization

41.0%
0%25%50%75%100%

Spent

₹374 Cr

Remaining

₹539 Cr

Total

₹913 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹887 Cr

Revised Cost

₹913 Cr

Increase

+₹26 Cr

Escalation

+2.9%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

22/11/2025

Revised Completion

Completed

Project Details

Project Code618919
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-05

Financial Summary

Original Cost₹887 Cr
Revised Cost₹913 Cr
Expenditure₹374 Cr
Original End Date22/11/2025
Revised DateN/A

Project Intelligence

Cost has increased by ₹26 Cr (2.9%) from the original estimate of ₹887 Cr.

Expenditure stands at ₹374 Cr, which is 41.0% of the revised project cost.

Remaining budget: ₹539 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L PS from Mandlem Existing Km. 38.000/Design Km.30.600 to Atmakur Existing Km.73.000/Design Km 66.115 of NH340C Package2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹887.00 Cr, later revised to ₹913.03 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L PS from Mandlem Existing Km. 38.000/Design Km.30.600 to Atmakur Existing Km.7"?
4L PS from Mandlem Existing Km. 38.000/Design Km.30.600 to Atmakur Existing Km.73.000/Design Km 66.115 of NH340C Package2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹887 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹887 Cr and has been revised to ₹913 Cr — a cost overrun of +2.9%. Expenditure to date: ₹374 Cr (41.0% of revised cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
4L PS from Mandlem Existing Km. 38.000/Design Km.30.600 to A is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618919. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L PS from Mandlem Existing Km. 38.000/Design Km.30.600 to A is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.