4L of Madurai Ring Road Phase 1 [Vadipatti-Thamrapatti] from km 0.00 - km 29.960
Original Cost
₹900 Cr
Baseline estimate
Revised Cost
₹900 Cr
Latest approved cost
Expenditure
₹906 Cr
Spent to date
Utilization
100.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹0 Cr
Budget left
Budget Utilization
100.6%Spent
₹906 Cr
Remaining
₹0 Cr
Total
₹900 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/03/2022
Revised Completion
15/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹900 Cr — no cost escalation recorded.
Expenditure stands at ₹906 Cr, which is 100.6% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of Madurai Ring Road Phase 1 [Vadipatti-Thamrapatti] from km 0.00 - km 29.960 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹900.00 Cr, later revised to ₹900.05 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of Madurai Ring Road Phase 1 [Vadipatti-Thamrapatti] from km 0.00 - km 29.960"?
- 4L of Madurai Ring Road Phase 1 [Vadipatti-Thamrapatti] from km 0.00 - km 29.960 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tamil Nadu. Original cost: ₹900 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹900 Cr has not been significantly revised. Expenditure: ₹906 Cr (100.6% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L of Madurai Ring Road Phase 1 [Vadipatti-Thamrapatti] from is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618563. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Madurai Ring Road Phase 1 [Vadipatti-Thamrapatti] from is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.