Roads & HighwaysIPM · Central Project#618616

4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 laning of missing link of Amran section of NH-151A Approx. length 6.55 Km from existing Ch. 42000 to 48500 of ongoing Dhrol-Bhadra-Pipaliya section of NH-151A

Ministry of Road Transport & HighwaysGujarat
Revised Cost: ₹456 CrUtilization: 36.4%

Original Cost

₹626 Cr

Baseline estimate

On budget

Revised Cost

₹456 Cr

Latest approved cost

Expenditure

₹166 Cr

Spent to date

Utilization

36.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹290 Cr

Budget left

Budget Utilization

36.4%
0%25%50%75%100%

Spent

₹166 Cr

Remaining

₹290 Cr

Total

₹456 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/02/2027

Revised Completion

02/02/2027

Completed

Project Details

Project Code618616
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateGujarat
Data Month2026-08

Financial Summary

Original Cost₹626 Cr
Revised Cost₹456 Cr
Expenditure₹166 Cr
Original End Date02/02/2027
Revised Date02/02/2027

Project Intelligence

Project is within original budget of ₹626 Cr — no cost escalation recorded.

Expenditure stands at ₹166 Cr, which is 36.4% of the revised project cost.

Remaining budget: ₹290 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 laning of missing link of Amran section of NH-151A Approx. length 6.55 Km from existing Ch. 42000 to 48500 of ongoing Dhrol-Bhadra-Pipaliya section of NH-151A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹626.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 la"?
4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 laning of missing link of Amran section of NH-151A Approx. length 6.55 Km from existing Ch. 42000 to 48500 of ongoing Dhrol-Bhadra-Pipaliya section of NH-151A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹626 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹626 Cr and has been revised to ₹456 Cr — a cost overrun of -27.2%. Expenditure to date: ₹166 Cr (36.4% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618616. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.