4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 laning of missing link of Amran section of NH-151A Approx. length 6.55 Km from existing Ch. 42000 to 48500 of ongoing Dhrol-Bhadra-Pipaliya section of NH-151A
Original Cost
₹626 Cr
Baseline estimate
Revised Cost
₹456 Cr
Latest approved cost
Expenditure
₹166 Cr
Spent to date
Utilization
36.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹290 Cr
Budget left
Budget Utilization
36.4%Spent
₹166 Cr
Remaining
₹290 Cr
Total
₹456 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/02/2027
Revised Completion
02/02/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹626 Cr — no cost escalation recorded.
Expenditure stands at ₹166 Cr, which is 36.4% of the revised project cost.
Remaining budget: ₹290 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 laning of missing link of Amran section of NH-151A Approx. length 6.55 Km from existing Ch. 42000 to 48500 of ongoing Dhrol-Bhadra-Pipaliya section of NH-151A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹626.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 la"?
- 4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km & widening upto 4 laning of missing link of Amran section of NH-151A Approx. length 6.55 Km from existing Ch. 42000 to 48500 of ongoing Dhrol-Bhadra-Pipaliya section of NH-151A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹626 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹626 Cr and has been revised to ₹456 Cr — a cost overrun of -27.2%. Expenditure to date: ₹166 Cr (36.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618616. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L of Dhrol bypass section of NH-151A Approx. length 5.7 Km is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.