4L Mitigation Measure structures on CH/MH Border to Wainganga Bridge Section of NH-6 New NH-53
Original Cost
₹540 Cr
Baseline estimate
Revised Cost
₹469 Cr
Latest approved cost
Expenditure
₹464 Cr
Spent to date
Utilization
99.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹5 Cr
Budget left
Budget Utilization
99.0%Spent
₹464 Cr
Remaining
₹5 Cr
Total
₹469 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
07/11/2023
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹540 Cr — no cost escalation recorded.
Expenditure stands at ₹464 Cr, which is 99.0% of the revised project cost.
Remaining budget: ₹5 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L Mitigation Measure structures on CH/MH Border to Wainganga Bridge Section of NH-6 New NH-53 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹540.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L Mitigation Measure structures on CH/MH Border to Wainganga Bridge Section of "?
- 4L Mitigation Measure structures on CH/MH Border to Wainganga Bridge Section of NH-6 New NH-53 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹540 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹540 Cr and has been revised to ₹469 Cr — a cost overrun of -13.2%. Expenditure to date: ₹464 Cr (99.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L Mitigation Measure structures on CH/MH Border to Waingang is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618588. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Mitigation Measure structures on CH/MH Border to Waingang is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.