Roads & HighwaysIPM · Central Project +5.7% overrun#618864

4L from Mathura Bypass Start at Existing Km. 154.20 of NH-44 to Gaju Village at Km 32.982 of NH-530B Pkg-IB

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹1821 CrUtilization: 57.7%Overrun: +₹99 Cr

Original Cost

₹1722 Cr

Baseline estimate

+6% overrun

Revised Cost

₹1821 Cr

Latest approved cost

Expenditure

₹1050 Cr

Spent to date

Utilization

57.7%

Of revised budget

Escalated

Cost Status

+5.7%

+₹99 Cr increase

Remaining

₹771 Cr

Budget left

Budget Utilization

57.7%
0%25%50%75%100%

Spent

₹1050 Cr

Remaining

₹771 Cr

Total

₹1821 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1722 Cr

Revised Cost

₹1821 Cr

Increase

+₹99 Cr

Escalation

+5.7%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

19/03/2025

Revised Completion

01/07/2026

Completed

Project Details

Project Code618864
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-05

Financial Summary

Original Cost₹1722 Cr
Revised Cost₹1821 Cr
Expenditure₹1050 Cr
Original End Date19/03/2025
Revised Date01/07/2026

Project Intelligence

Cost has increased by ₹99 Cr (5.7%) from the original estimate of ₹1722 Cr.

Expenditure stands at ₹1050 Cr, which is 57.7% of the revised project cost.

Remaining budget: ₹771 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L from Mathura Bypass Start at Existing Km. 154.20 of NH-44 to Gaju Village at Km 32.982 of NH-530B Pkg-IB is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1722.00 Cr, later revised to ₹1820.77 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L from Mathura Bypass Start at Existing Km. 154.20 of NH-44 to Gaju Village at "?
4L from Mathura Bypass Start at Existing Km. 154.20 of NH-44 to Gaju Village at Km 32.982 of NH-530B Pkg-IB is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹1722 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1722 Cr and has been revised to ₹1821 Cr — a cost overrun of +5.7%. Expenditure to date: ₹1050 Cr (57.7% of revised cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
4L from Mathura Bypass Start at Existing Km. 154.20 of NH-44 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618864. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L from Mathura Bypass Start at Existing Km. 154.20 of NH-44 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.