4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 to Kasganj Bypass End Existing Km.150.100 of NH 530B/ Design Km. 123.100 of NH 530B
Original Cost
₹2290 Cr
Baseline estimate
Revised Cost
₹2224 Cr
Latest approved cost
Expenditure
₹1042 Cr
Spent to date
Utilization
46.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1181 Cr
Budget left
Budget Utilization
46.9%Spent
₹1042 Cr
Remaining
₹1181 Cr
Total
₹2224 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/06/2026
Revised Completion
15/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2290 Cr — no cost escalation recorded.
Expenditure stands at ₹1042 Cr, which is 46.9% of the revised project cost.
Remaining budget: ₹1181 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 to Kasganj Bypass End Existing Km.150.100 of NH 530B/ Design Km. 123.100 of NH 530B is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2290.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 t"?
- 4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 to Kasganj Bypass End Existing Km.150.100 of NH 530B/ Design Km. 123.100 of NH 530B is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹2290 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2290 Cr and has been revised to ₹2224 Cr — a cost overrun of -2.9%. Expenditure to date: ₹1042 Cr (46.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618868. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.