Roads & HighwaysIPM · Central Project#618868

4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 to Kasganj Bypass End Existing Km.150.100 of NH 530B/ Design Km. 123.100 of NH 530B

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹2224 CrUtilization: 46.9%

Original Cost

₹2290 Cr

Baseline estimate

On budget

Revised Cost

₹2224 Cr

Latest approved cost

Expenditure

₹1042 Cr

Spent to date

Utilization

46.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1181 Cr

Budget left

Budget Utilization

46.9%
0%25%50%75%100%

Spent

₹1042 Cr

Remaining

₹1181 Cr

Total

₹2224 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

05/06/2026

Revised Completion

15/12/2026

Completed

Project Details

Project Code618868
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹2290 Cr
Revised Cost₹2224 Cr
Expenditure₹1042 Cr
Original End Date05/06/2026
Revised Date15/12/2026

Project Intelligence

Project is within original budget of ₹2290 Cr — no cost escalation recorded.

Expenditure stands at ₹1042 Cr, which is 46.9% of the revised project cost.

Remaining budget: ₹1181 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 to Kasganj Bypass End Existing Km.150.100 of NH 530B/ Design Km. 123.100 of NH 530B is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2290.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 t"?
4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B/Design Km. 66.000 to Kasganj Bypass End Existing Km.150.100 of NH 530B/ Design Km. 123.100 of NH 530B is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹2290 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹2290 Cr and has been revised to ₹2224 Cr — a cost overrun of -2.9%. Expenditure to date: ₹1042 Cr (46.9% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618868. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L from Devinagar Bypass End Existing Km. 208.000 of NH 530B is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.