Original Cost
₹1105 Cr
Baseline estimate
Revised Cost
₹1098 Cr
Latest approved cost
Expenditure
₹205 Cr
Spent to date
Utilization
18.6%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹893 Cr
Budget left
Budget Utilization
18.6%Spent
₹205 Cr
Remaining
₹893 Cr
Total
₹1098 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/07/2027
Revised Completion
28/02/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1105 Cr — no cost escalation recorded.
Expenditure stands at ₹205 Cr, which is 18.6% of the revised project cost.
Remaining budget: ₹893 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 KmPackage-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1105.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from"?
- 4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 KmPackage-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1105 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1105 Cr and has been revised to ₹1098 Cr — a cost overrun of -0.6%. Expenditure to date: ₹205 Cr (18.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L Access Controlled Greenfield Highway section on NH-163G W is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618816. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Access Controlled Greenfield Highway section on NH-163G W is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.