Roads & HighwaysIPM · Central Project#618816

4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 KmPackage-III

Ministry of Road Transport & HighwaysTelangana
Revised Cost: ₹1098 CrUtilization: 18.6%

Original Cost

₹1105 Cr

Baseline estimate

On budget

Revised Cost

₹1098 Cr

Latest approved cost

Expenditure

₹205 Cr

Spent to date

Utilization

18.6%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹893 Cr

Budget left

Budget Utilization

18.6%
0%25%50%75%100%

Spent

₹205 Cr

Remaining

₹893 Cr

Total

₹1098 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

03/07/2027

Revised Completion

28/02/2028

Completed

Project Details

Project Code618816
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTelangana
Data Month2026-08

Financial Summary

Original Cost₹1105 Cr
Revised Cost₹1098 Cr
Expenditure₹205 Cr
Original End Date03/07/2027
Revised Date28/02/2028

Project Intelligence

Project is within original budget of ₹1105 Cr — no cost escalation recorded.

Expenditure stands at ₹205 Cr, which is 18.6% of the revised project cost.

Remaining budget: ₹893 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 KmPackage-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1105.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from"?
4L Access Controlled Greenfield Highway section on NH-163G Warangal-Khammam from Thallasenkesa village at Design Ch. 189.650 km to V.Vekatayapalem village in Khammam District at Design Ch. 220.480 KmPackage-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1105 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1105 Cr and has been revised to ₹1098 Cr — a cost overrun of -0.6%. Expenditure to date: ₹205 Cr (18.6% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L Access Controlled Greenfield Highway section on NH-163G W is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618816. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Access Controlled Greenfield Highway section on NH-163G W is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.