Roads & HighwaysIPM · Central Project#618811

4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 KmPackage-III

Ministry of Road Transport & HighwaysTelangana
Revised Cost: ₹1171 CrUtilization: 17.9%

Original Cost

₹1184 Cr

Baseline estimate

On budget

Revised Cost

₹1171 Cr

Latest approved cost

Expenditure

₹210 Cr

Spent to date

Utilization

17.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹961 Cr

Budget left

Budget Utilization

17.9%
0%25%50%75%100%

Spent

₹210 Cr

Remaining

₹961 Cr

Total

₹1171 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

21/10/2027

Revised Completion

31/01/2028

Completed

Project Details

Project Code618811
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTelangana
Data Month2026-08

Financial Summary

Original Cost₹1184 Cr
Revised Cost₹1171 Cr
Expenditure₹210 Cr
Original End Date21/10/2027
Revised Date31/01/2028

Project Intelligence

Project is within original budget of ₹1184 Cr — no cost escalation recorded.

Expenditure stands at ₹210 Cr, which is 17.9% of the revised project cost.

Remaining budget: ₹961 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 KmPackage-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1184.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangi"?
4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 KmPackage-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1184 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1184 Cr and has been revised to ₹1171 Cr — a cost overrun of -1.1%. Expenditure to date: ₹210 Cr (17.9% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4L Access Controlled Greenfield Highway Section Mancherial is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618811. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Access Controlled Greenfield Highway Section Mancherial is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.