Original Cost
₹1184 Cr
Baseline estimate
Revised Cost
₹1171 Cr
Latest approved cost
Expenditure
₹210 Cr
Spent to date
Utilization
17.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹961 Cr
Budget left
Budget Utilization
17.9%Spent
₹210 Cr
Remaining
₹961 Cr
Total
₹1171 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
21/10/2027
Revised Completion
31/01/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹1184 Cr — no cost escalation recorded.
Expenditure stands at ₹210 Cr, which is 17.9% of the revised project cost.
Remaining budget: ₹961 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 KmPackage-III is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1184.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangi"?
- 4L Access Controlled Greenfield Highway Section Mancherial Warangal from Pangidipalle village at Design Ch. 72.350 Km to Oorugonda village at Design Ch. 112.240 KmPackage-III is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹1184 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1184 Cr and has been revised to ₹1171 Cr — a cost overrun of -1.1%. Expenditure to date: ₹210 Cr (17.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4L Access Controlled Greenfield Highway Section Mancherial is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618811. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4L Access Controlled Greenfield Highway Section Mancherial is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.