4/6L Greenfield Ludhiana Rupnagar highway from Jn. with NE-5 village near to ManewalLudhiana to Jn. with NH-205 near Bheora Village Rupnagar from Km. 0.00 to Km. 37.7 including spur to Kharar with Ludhiana bypass of NH-205K Pkg-1
Original Cost
₹1369 Cr
Baseline estimate
Revised Cost
₹1382 Cr
Latest approved cost
Expenditure
₹533 Cr
Spent to date
Utilization
38.6%
Of revised budget
Cost Status
+1.0%
+₹13 Cr increase
Remaining
₹849 Cr
Budget left
Budget Utilization
38.6%Spent
₹533 Cr
Remaining
₹849 Cr
Total
₹1382 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1369 Cr
Revised Cost
₹1382 Cr
Increase
+₹13 Cr
Escalation
+1.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
10/12/2024
Revised Completion
10/12/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹13 Cr (1.0%) from the original estimate of ₹1369 Cr.
Expenditure stands at ₹533 Cr, which is 38.6% of the revised project cost.
Remaining budget: ₹849 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4/6L Greenfield Ludhiana Rupnagar highway from Jn. with NE-5 village near to ManewalLudhiana to Jn. with NH-205 near Bheora Village Rupnagar from Km. 0.00 to Km. 37.7 including spur to Kharar with Ludhiana bypass of NH-205K Pkg-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1369.00 Cr, later revised to ₹1382.48 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4/6L Greenfield Ludhiana Rupnagar highway from Jn. with NE-5 village near to Man"?
- 4/6L Greenfield Ludhiana Rupnagar highway from Jn. with NE-5 village near to ManewalLudhiana to Jn. with NH-205 near Bheora Village Rupnagar from Km. 0.00 to Km. 37.7 including spur to Kharar with Ludhiana bypass of NH-205K Pkg-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Punjab. Original cost: ₹1369 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1369 Cr and has been revised to ₹1382 Cr — a cost overrun of +1%. Expenditure to date: ₹533 Cr (38.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4/6L Greenfield Ludhiana Rupnagar highway from Jn. with NE-5 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619318. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4/6L Greenfield Ludhiana Rupnagar highway from Jn. with NE-5 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.