4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwani to Sidhra Section of NH-44 and from Design Chainage Km 550.900 to Km 566.520 Domel to Katra Section Phase II-Package XVII
Original Cost
₹2895 Cr
Baseline estimate
Revised Cost
₹2895 Cr
Latest approved cost
Expenditure
₹1017 Cr
Spent to date
Utilization
35.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹1877 Cr
Budget left
Budget Utilization
35.1%Spent
₹1017 Cr
Remaining
₹1877 Cr
Total
₹2895 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
13/06/2025
Revised Completion
08/11/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹2895 Cr — no cost escalation recorded.
Expenditure stands at ₹1017 Cr, which is 35.1% of the revised project cost.
Remaining budget: ₹1877 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwani to Sidhra Section of NH-44 and from Design Chainage Km 550.900 to Km 566.520 Domel to Katra Section Phase II-Package XVII is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2895.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwa"?
- 4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwani to Sidhra Section of NH-44 and from Design Chainage Km 550.900 to Km 566.520 Domel to Katra Section Phase II-Package XVII is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹2895 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹2895 Cr has not been significantly revised. Expenditure: ₹1017 Cr (35.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4/6L Access Control Expressway from Design Chainage Km 515.0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618495. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4/6L Access Control Expressway from Design Chainage Km 515.0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.