Roads & HighwaysIPM · Central Project#618495

4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwani to Sidhra Section of NH-44 and from Design Chainage Km 550.900 to Km 566.520 Domel to Katra Section Phase II-Package XVII

Ministry of Road Transport & HighwaysJammu & Kashmir
Revised Cost: ₹2895 CrUtilization: 35.1%

Original Cost

₹2895 Cr

Baseline estimate

On budget

Revised Cost

₹2895 Cr

Latest approved cost

Expenditure

₹1017 Cr

Spent to date

Utilization

35.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹1877 Cr

Budget left

Budget Utilization

35.1%
0%25%50%75%100%

Spent

₹1017 Cr

Remaining

₹1877 Cr

Total

₹2895 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

13/06/2025

Revised Completion

08/11/2027

Completed

Project Details

Project Code618495
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateJammu & Kashmir
Data Month2026-08

Financial Summary

Original Cost₹2895 Cr
Revised Cost₹2895 Cr
Expenditure₹1017 Cr
Original End Date13/06/2025
Revised Date08/11/2027

Project Intelligence

Project is within original budget of ₹2895 Cr — no cost escalation recorded.

Expenditure stands at ₹1017 Cr, which is 35.1% of the revised project cost.

Remaining budget: ₹1877 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwani to Sidhra Section of NH-44 and from Design Chainage Km 550.900 to Km 566.520 Domel to Katra Section Phase II-Package XVII is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹2895.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwa"?
4/6L Access Control Expressway from Design Chainage Km 515.000 to 528.300 Kunjwani to Sidhra Section of NH-44 and from Design Chainage Km 550.900 to Km 566.520 Domel to Katra Section Phase II-Package XVII is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Jammu & Kashmir. Original cost: ₹2895 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹2895 Cr has not been significantly revised. Expenditure: ₹1017 Cr (35.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4/6L Access Control Expressway from Design Chainage Km 515.0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618495. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4/6L Access Control Expressway from Design Chainage Km 515.0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.