4-lanning of Gyaraspur to Rahatgarh section of NH-146 from Design Ch. 88361 to Ch 124470 in the state of MP on HAM mode
Original Cost
₹903 Cr
Baseline estimate
Revised Cost
₹592 Cr
Latest approved cost
Expenditure
₹192 Cr
Spent to date
Utilization
32.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹401 Cr
Budget left
Budget Utilization
32.4%Spent
₹192 Cr
Remaining
₹401 Cr
Total
₹592 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/11/2027
Revised Completion
05/11/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹903 Cr — no cost escalation recorded.
Expenditure stands at ₹192 Cr, which is 32.4% of the revised project cost.
Remaining budget: ₹401 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
4-lanning of Gyaraspur to Rahatgarh section of NH-146 from Design Ch. 88361 to Ch 124470 in the state of MP on HAM mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹903.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "4-lanning of Gyaraspur to Rahatgarh section of NH-146 from Design Ch. 88361 to C"?
- 4-lanning of Gyaraspur to Rahatgarh section of NH-146 from Design Ch. 88361 to Ch 124470 in the state of MP on HAM mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹903 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹903 Cr and has been revised to ₹592 Cr — a cost overrun of -34.4%. Expenditure to date: ₹192 Cr (32.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 4-lanning of Gyaraspur to Rahatgarh section of NH-146 from D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618672. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4-lanning of Gyaraspur to Rahatgarh section of NH-146 from D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.