Roads & HighwaysIPM · Central Project#619106

4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500 of Belgaum-Hungund-Raichur Section of NH 748 A Package-5

Ministry of Road Transport & HighwaysKarnataka
Revised Cost: ₹869 CrUtilization: 31.2%

Original Cost

₹1142 Cr

Baseline estimate

On budget

Revised Cost

₹869 Cr

Latest approved cost

Expenditure

₹271 Cr

Spent to date

Utilization

31.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹598 Cr

Budget left

Budget Utilization

31.2%
0%25%50%75%100%

Spent

₹271 Cr

Remaining

₹598 Cr

Total

₹869 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/11/2026

Revised Completion

31/08/2027

Completed

Project Details

Project Code619106
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateKarnataka
Data Month2026-08

Financial Summary

Original Cost₹1142 Cr
Revised Cost₹869 Cr
Expenditure₹271 Cr
Original End Date20/11/2026
Revised Date31/08/2027

Project Intelligence

Project is within original budget of ₹1142 Cr — no cost escalation recorded.

Expenditure stands at ₹271 Cr, which is 31.2% of the revised project cost.

Remaining budget: ₹598 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500 of Belgaum-Hungund-Raichur Section of NH 748 A Package-5 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1142.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500 of Belgaum-Hungund-Raich"?
4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500 of Belgaum-Hungund-Raichur Section of NH 748 A Package-5 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Karnataka. Original cost: ₹1142 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1142 Cr and has been revised to ₹869 Cr — a cost overrun of -23.9%. Expenditure to date: ₹271 Cr (31.2% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500 of B is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619106. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 4 Lane with PS from Des. Ch 182.300 to Des. Ch. 228.500 of B is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.