2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha Mehulwa-Talbehat Pkg-II Section of NH- 346
Original Cost
₹582 Cr
Baseline estimate
Revised Cost
₹593 Cr
Latest approved cost
Expenditure
₹275 Cr
Spent to date
Utilization
46.3%
Of revised budget
Cost Status
+1.8%
+₹11 Cr increase
Remaining
₹318 Cr
Budget left
Budget Utilization
46.3%Spent
₹275 Cr
Remaining
₹318 Cr
Total
₹593 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹582 Cr
Revised Cost
₹593 Cr
Increase
+₹11 Cr
Escalation
+1.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
12/09/2025
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹11 Cr (1.8%) from the original estimate of ₹582 Cr.
Expenditure stands at ₹275 Cr, which is 46.3% of the revised project cost.
Remaining budget: ₹318 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha Mehulwa-Talbehat Pkg-II Section of NH- 346 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹582.00 Cr, later revised to ₹592.71 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha"?
- 2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha Mehulwa-Talbehat Pkg-II Section of NH- 346 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹582 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹582 Cr and has been revised to ₹593 Cr — a cost overrun of +1.8%. Expenditure to date: ₹275 Cr (46.3% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- 2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618751. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.