Roads & HighwaysIPM · Central Project +1.8% overrun#618751

2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha Mehulwa-Talbehat Pkg-II Section of NH- 346

Ministry of Road Transport & HighwaysMadhya Pradesh
Revised Cost: ₹593 CrUtilization: 46.3%Overrun: +₹11 Cr

Original Cost

₹582 Cr

Baseline estimate

+2% overrun

Revised Cost

₹593 Cr

Latest approved cost

Expenditure

₹275 Cr

Spent to date

Utilization

46.3%

Of revised budget

Escalated

Cost Status

+1.8%

+₹11 Cr increase

Remaining

₹318 Cr

Budget left

Budget Utilization

46.3%
0%25%50%75%100%

Spent

₹275 Cr

Remaining

₹318 Cr

Total

₹593 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹582 Cr

Revised Cost

₹593 Cr

Increase

+₹11 Cr

Escalation

+1.8%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

12/09/2025

Revised Completion

31/03/2027

Completed

Project Details

Project Code618751
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMadhya Pradesh
Data Month2026-08

Financial Summary

Original Cost₹582 Cr
Revised Cost₹593 Cr
Expenditure₹275 Cr
Original End Date12/09/2025
Revised Date31/03/2027

Project Intelligence

Cost has increased by ₹11 Cr (1.8%) from the original estimate of ₹582 Cr.

Expenditure stands at ₹275 Cr, which is 46.3% of the revised project cost.

Remaining budget: ₹318 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha Mehulwa-Talbehat Pkg-II Section of NH- 346 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹582.00 Cr, later revised to ₹592.71 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha"?
2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 to Km 75.700 Vidisha Mehulwa-Talbehat Pkg-II Section of NH- 346 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹582 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹582 Cr and has been revised to ₹593 Cr — a cost overrun of +1.8%. Expenditure to date: ₹275 Cr (46.3% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618751. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. 2L PS of Hinotiya-Mehulwa section of NH-346 from Km. 27.000 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.