| L11 | Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg-IV, Design Km 73 300 (Bikapur) to Km 140 960 (Patranga) in the state of Uttar Pradesh on Engineering, Procurement and Construction (EPC) basis. ministry of road transport and highways•AYODHYA•20-Apr-2023 | ₹674.10 Cr | ₹808.08 Cr | -16.58% | Admitted-Finance | View |
| L11 | Improvement and up-gradation of newly declared National Highways NH-227B(84 Kosi Parikrama Marg)Package II Design Km29.000 (Sarpur) to Km47.878/47.800 (Gosaiganj)in the state of Uttar Pradesh on Engineering, Procurement and Construction(EPC) basis. ministry of road transport and highways•AYODHYA•19-Jun-2023 | ₹576.70 Cr | ₹591.28 Cr | -2.47% | Admitted-Finance | View |
| L13 | Widening to four 548B from Km 80 Near Murgundi to Km 140.2 near Chikkodi excludimg length from Km 118.45 to Km 128.45 in the State of Karnataka on EPC mode ministry of road transport and highways•Km 80 Near Murgundi to Km 140.2 near Chikkodi•19-Jun-2023 | ₹534.40 Cr | ₹609.04 Cr | -12.26% | Admitted-Finance | View |
| L20 | Widening to four lane with paved shoulder of NH 548 B from Km 118.450 Near Shirguppi to Km 128.450 Near Ankali in the State of Karnataka ministry of road transport and highways•NH 548B Km 118.450 to 128.450•03-Jul-2023 | ₹677.86 Cr | ₹887.23 Cr | -23.6% | Admitted-Finance | View |
| L1 | Development of 4 lane with paved shoulders for the road section Talwandi Sabo-Raman to Refinery Road Junction with Bathinda-Dabwali road of NH-254 from existing Km 131.600 to 155.650 (Design Km 131.600 to Km 152.600) in the State of Punjab under EPC ministry of road transport and highways•Talwandi Sabo-Raman to Refinery Road Junction•18-Jul-2023 | ₹241.00 Cr | ₹227.84 Cr | +5.78% | Awarded (L1) | View |
| DQ | Widening and Strength. to 2 lane with P.S/4 Lane with PS config. from km.61.500 of NH727B near Nawalpur(km178.500 of Sonauli Balia Marg,Old SH01)i.e.end point of Salempur Bypass to km.106.495 of NH727B near Sikanderpur under EPCMode in thestate of UP ministry of road transport and highways•DEORIA•01-Sep-2023 | — | ₹963.17 Cr | — | Rejected-Technical | View |
| L13 | RFP for Construction of Deoria Bypass from existing Km. 27.140 to existing Km. 46.780 (Design Km. 49.109) on NH727A (Design length 21.969 Km.) to four lane with paved shoulder configuration under Hybrid Annuity Mode (HAM) in the State of UP. ministry of road transport and highways•DEORIA•03-Oct-2023 | ₹730.00 Cr | ₹718.52 Cr | +1.6% | Admitted-Finance | View |
| L9 | 6 Laning of Pune Hyderabad section of NH 65 from km 493.000 to 524.000 from Sangareddy X roads to Madinaguda excluding BHEL flyover from km 520.000 to 521.650 in the State of Telangana on EPC Basis ministry of road transport and highways•Telangana•07-Oct-2023 | ₹1055.70 Cr | ₹1011.34 Cr | +4.39% | Admitted-Finance | View |
| L9 | Upgradation of Pendurthi to Bowdara section of NH 516B to 2 4 lane with paved shoulders configuration from its junction with NH 16 near Pendurthi Kothavalasa S. Kota and terminating at its junction with NH 516E near Bowdara in the state of AP ministry of road transport and highways•Andhra Pradesh•07-Nov-2023 | ₹641.50 Cr | ₹782.91 Cr | -18.06% | Admitted-Finance | View |
| — | Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda (Km. 49.050 to Km. 78.270) to 4 LPS in the States of Maharashtra/Gujarat on EPC mode. ministry of road transport and highways•Nandurbar•20-Dec-2023 | — | ₹608.47 Cr | — | Accepted-Technical | View |
| DQ | Up-gradation of Shyampur to Sabalgarh Road section of NH-552Ext. from km 111.800 to 166.850 to Two Lane with Paved Shoulder configuration in the State of Madhya Pradesh on Hybrid Annuity Mode ministry of road transport and highways•Shyampur to Sabalgarh•21-Feb-2024 | ₹633.60 Cr | ₹629.94 Cr | +0.58% | Rejected-Finance | View |
| L6 | Rehabilitation and Upgradation of NH-753B to Four lane with Paved Shoulder configuration from Km 78.270 to Km 116.670 (Section-Taloda Gujarat-Maharashtra Border) in the State of Maharashtra on Hybrid Annuity Mode. ministry of road transport and highways•Taloda•28-Feb-2024 | ₹547.00 Cr | ₹660.20 Cr | -17.15% | Admitted-Finance | View |
| L3 | Upgradation of Shahdol- Sagartola Section of NH 543 from km 0/000 to km 69/400 to 2 lane with paved shoulders under Hybrid Annuity Mode (HAM) in the State of Madhya Pradesh ministry of road transport and highways•Shahdol- Sagartola Section of NH 543•05-Mar-2024 | ₹459.70 Cr | ₹515.18 Cr | -10.77% | Admitted-Finance | View |
| L3 | Upgradation of Mehsana Visnagar Vadnagar Kheralu Idar section from km 0/00 to km 81/300 of NH168G (Mehsana to Idar) in the State of Gujarat (Total length 81.300 km) on HAM. ministry of road transport and highways•New Delhi•07-Mar-2024 | ₹681.00 Cr | ₹784.71 Cr | -13.22% | Admitted-Finance | View |
| L5 | Construction of bypass around Giridih town of NH-114A to 2 lane with paved shoulder from Km 0.000 to km 23.835 (Design chainage) in the State of Jharkhand under EPC Mode ministry of road transport and highways•Giridih•01-Apr-2024 | ₹212.02 Cr | ₹331.59 Cr | -36.06% | Admitted-Finance | View |
| L3 | Construction of 6 lane flyover from Khapari ROB to Mihan Interchange and upgradation of existing 4 LPS road to 6 LPS with service road by flexible pavement in section of Nagpur - Hyderabad in the state of Maharashtra on EPC mode ministry of road transport and highways•Khapari•08-Mar-2024 | ₹350.00 Cr | ₹430.04 Cr | -18.61% | Admitted-Finance | View |
| L11 | Rehabilitation, upgradation and widening of existing highway to 2L/4LPS (Rigid Pavement) of NH 160 section- Phaltan to Mhaishal near Karnataka Border - Package-II and Package III combined- starting from at Dahiwadi Village to ending at Vita Village ministry of road transport and highways•Phaltan•08-Mar-2024 | ₹350.00 Cr | ₹469.08 Cr | -25.39% | Admitted-Finance | View |
| L10 | Widening, Reconstruction and Up-gradation to 2 LPS/ Four Lane configuration for the work of Ahmednagar to Sabalkhed and Ashti to Chinchpur Section in the state of Maharashtra on EPC mode. ministry of road transport and highways•Sabalkhed•08-Mar-2024 | ₹372.00 Cr | ₹459.56 Cr | -19.05% | Admitted-Finance | View |
| L12 | Rehabilitation, upgradation and widening of existing highway to 2L-4LPS (Rigid Pavement) of NH 160 section- Phaltan to Mhaisal near Karnataka Border. Package-I starting from Phaltan Village and ending at Dahiwadi Village Bus Stop in the State of Maha ministry of road transport and highways•Mhaisal•08-Mar-2024 | ₹252.00 Cr | ₹376.32 Cr | -33.04% | Admitted-Finance | View |
| L5 | Rehabilitation and Upgradation of Injegaon to Pathari , Borgavhan to Selu and Digras Phata to Deogaon Phata sections of NH 548 B to 2-4 LPS configuration on EPC mode in the state of Maharashtra. ministry of road transport and highways•Injegaon•11-Mar-2024 | ₹444.16 Cr | ₹551.76 Cr | -19.5% | Admitted-Finance | View |
| L1 | RFP for Construction of 4 lane Mirzapur bypass including bridge over river Ganga from km 0.000 to km 15.000 of NH 135A in the State of Uttar Pradesh on HAM Mode. ministry of road transport and highways•MIRZAPUR•12-Mar-2024 | ₹907.00 Cr | ₹988.72 Cr | -8.27% | Awarded (L1) | View |
| L6 | Up-gradation of existing 6 Lane road including elevated corridor as per site requirements from km 0/00 to km 10/170 of NH 47 (Narol Junction to Sarkhej Junction) in the State of Gujrat on Hybrid Annuity Mode. ministry of road transport and highways•New Delhi•14-Mar-2024 | ₹812.00 Cr | ₹883.24 Cr | -8.07% | Admitted-Finance | View |
| L8 | Upgradation to two lane with Paved Shoulder Configuration of Kondagaon - Narayanpur from design Ch. 0.00 - 48.693 (Design Length 47.493 Km., 1.20Km. retained) on NH 130D in the State of Chhattisgarh ministry of road transport and highways•Narayanpur•28-Jun-2024 | ₹185.16 Cr | ₹234.38 Cr | -21% | Admitted-Finance | View |
| — | Construction of road from km 0.000 to Km 60.250 (package-1) of Taliha to Tato stretch of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹822.35 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 160.75 to km 209.90 (Package-5) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹821.55 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 55.725 to km 113.250 (Package-3) of Huri-Taliha section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹821.28 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 70.000 to km 113.000 (Package-3) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹793.89 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from km 34.700 to km 70.000 (Package-2) of Bomdila-Nafra-Lada section of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹564.95 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from Km 17.812 to Km 55.377 of Bile to Migging stretch (Ch.0.0 at Migging) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹512.78 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Construction of road from Km 0.000 to Km 27.430 of Bile to Migging stretch (Ch.0.0 at Bile) of NH-913(Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh ministry of road transport and highways•Itanagar•05-Sep-2024 | — | ₹445.85 Cr | — | Admitted-Fee/PreQual/Technical | View |
| — | Rehabilitation and Up-gradation of NH-63 section from Udgir to Degloor and Aadampur phata to Sagroli Phata (km 175/881 to 233/238 and km 248/538 to 269/894) to 2LPS configuration in the State of Maharashtra on HAM mode. ministry of road transport and highways•Udgir•04-Oct-2024 | — | ₹604.20 Cr | — | Admitted-Fee/PreQual/Technical | View |
| L13 | Rehabilitation and Up-gradation for Yedshi-Latur road Section of stretch, NH- 63, starting from Ch. 24-350 to Ch. 61-875 Km (Length-37.525 Km) to 4LPS in the State of Maharashtra on EPC Mode. ministry of road transport and highways•Yedshi•07-Oct-2024 | ₹324.25 Cr | ₹452.56 Cr | -28.35% | Admitted-Finance | View |
| L5 | 4-laning of Ponda to Bhoma section of NH-748 from Km 125.440 to Km 135.050 in the State of Goa on EPC Mode. ministry of road transport and highways•Ponda•17-Oct-2024 | ₹281.23 Cr | ₹410.61 Cr | -31.51% | Admitted-Finance | View |
| — | 4 laning of NH-98 from KM. 23.284 to KM. 57.00 in the State of Jharkhand under Hybrid Annuity Mode national highways authority of india•NHAI HQ•10-Jan-2020 | — | ₹539.17 Cr | — | Admitted-Finance | View |
| DQ | 6Laning of Mandi Dabwali (Punjab/Haryana border) Chautala road section from Proposed Mandi Dabwali Bypass (Design Ch. 27.400) to Chautala (Design Ch. 62.200) of NH54 under BP (designed length 34.800) in Haryana under Hybrid Annuity Mode national highways authority of india•NHAI HQ•10-Jan-2020 | — | ₹529.79 Cr | — | Rejected-Technical | View |
| — | Four laning from Km 196.870 (Sankha) to Km 219.600 (Khajuri) on NH-75 (Section-IV) (Rehla-Garhwa Bypass) in the state of Jharkhand on HAM national highways authority of india•NHAI HQ•14-Jan-2020 | — | ₹616.80 Cr | — | Admitted-Finance | View |
| — | Six laning of Jodhpur Romana Bathinda Mandi Dabwali Punjab Haryana Border section of NH-54 from Design Ch 0.00 to Design Ch 27.400 Design length 27.40 km in the state of Punjab on HAM national highways authority of india•NHAI HQ•15-Jan-2020 | — | ₹411.63 Cr | — | Admitted-Finance | View |
| — | Four Laning of Munger to Mirzachauki section of NH-80 from Rasulpur to Mirzachauki Design Chainage Km. 157.350 to Km. 193.931 (Package-4) on Hybrid Annuity mode in the state of Bihar national highways authority of india•NHAI HQ•19-Sep-2020 | — | ₹868.93 Cr | — | Admitted-Finance | View |
| — | Construction of four lane Greenfield Delhi Amritsar Katra Expressway from Jussur Kheri on KMP Expressway to Junction with Rohtak Panipat road (NH 709) near Rukhi Paani village (Km 0.000 to Km 34.000) on HAM under Bharatmala Pariyojna in Haryana national highways authority of india•NHAI HQ•28-Sep-2020 | — | ₹1053.34 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Rohtak Panipat road (NH709) near Rukhi Paani village to Junction with Jind Panipat road (NH352A)near Gangana (Km 34.000 to Km 60.800) on HAM under BP in Haryana national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹858.41 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Jind-Panipat road NH352A near Gangana village to Junction with Jind Karnal road NH709A near Alewa village (Km 60.800 to Km 91.400) on HAM under BP in Haryana national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹894.98 Cr | — | Admitted-Finance | View |
| — | Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Jind Karnal road NH709A near Alewa to Junction with Ambala Kaithal Hissar road NH152 near Kharak Pandwa village Km 91.400 to 120.250 on HAM under BP in Haryana national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹838.50 Cr | — | Accepted-Technical | View |
| — | Construction of four lane Greenfield Delhi Amritsar Katra Expressway from Junction with Ambala Kaithal Hissar road NH152 to Junction with Patiala Samana Patran road SH10 Km 120.250 to Km 157.920 on HAM under BP in Haryana and Punjab national highways authority of india•NHAI HQ•29-Sep-2020 | — | ₹1099.94 Cr | — | Accepted-Technical | View |
| — | 4 Laning of Pangare to Waranga Phata sec from Km 134.500 to Km 174.645 of NH-161 including additional lengths of 800 m from Waranga Junction to Nanded and 700 m road from Waranga Junction NH-161 to Mahagaon in the State of Maharashtra on EPC mode national highways authority of india•NHAI HQ•30-Sep-2020 | — | ₹758.28 Cr | — | Admitted-Finance | View |
| — | Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2). national highways authority of india•NHAI HQ•16-Oct-2020 | — | ₹838.44 Cr | — | Admitted-Finance | View |
| — | 4-Laning of existing 2-laning stretch from Dharmapuri at km.117.000 to Lonand at km.166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode national highways authority of india•NHAI HQ•22-Oct-2020 | — | ₹798.43 Cr | — | Admitted-Finance | View |
| — | Four-Six Laning of Bodhre to Dhule section from km 390.000 to km 457.231(Design Chainage) of NH-211 (New NH-52) (Design Length-67.231 km) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode national highways authority of india•NHAI HQ•27-Oct-2020 | — | ₹971.12 Cr | — | Admitted-Finance | View |
| — | Construction of Four lane Nagpur-Katol Section of NH-353J from km 13.000 to km 62.900 (Design Chainage) in the State of Maharashtra under NH (O) on EPC Mode national highways authority of india•NHAI HQ•29-Oct-2020 | — | ₹805.29 Cr | — | Accepted-Technical | View |
| — | Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode national highways authority of india•NHAI HQ•29-Oct-2020 | — | ₹707.88 Cr | — | Admitted-Finance | View |
| — | Construction of 4-lane Greenfield Delhi-Katra Expressway from Junction with Patiala-Samana-Patran road (SH-10) near Ghagga village to Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh (Km 157.920 to Km 188.830) on EPC under BMP in Punjab national highways authority of india•NHAI HQ•17-Nov-2020 | — | ₹850.12 Cr | — | Accepted-Technical | View |
| — | Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH-65 near Patas -Vasunde Phata-Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra under BMP on EPC mode national highways authority of india•NHAI HQ•23-Nov-2020 | — | ₹702.60 Cr | — | Accepted-Technical | View |
| — | Construction of 4lane GF Delhi-Katra Expressway from Junction with Jalandhar-Kapurthala road NH-703A near Khojewal village-Junction with Amritsar-Tanda road NH-503A near Sri Hargobindpur Km 319.400-362.420 on EPC under BMP in Punjab national highways authority of india•NHAI HQ•27-Nov-2020 | — | ₹1437.20 Cr | — | Admitted-Finance | View |
| — | Four laning of Ahmednagar-Mirajgaon Karmala-Tembhurni section of NH-516A (Package-II from design km 38.775 Ghogargaon to design km 80.390 Ahmednagar-Solapur Border) in the state of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode national highways authority of india•NHAI HQ•04-Dec-2020 | — | ₹641.45 Cr | — | Admitted-Finance | View |
| — | Development of Six Lane Korlam-Kantakapalle Section of NH-130-CD Road from km 421.100 to km 445.100 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package-3(AP) national highways authority of india•NHAI HQ•09-Dec-2020 | — | ₹647.25 Cr | — | Accepted-Technical | View |
| — | Development of Six Lane Kantakapalle-Sabbavaram Section of NH-130-CD Road from km 445.100 to km 464.662 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package-4(AP) national highways authority of india•NHAI HQ•09-Dec-2020 | — | ₹549.99 Cr | — | Accepted-Technical | View |
| — | Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500 (Indapur) Design Length 42.131 km and One time improvement of selected stretches (Package-II) in the State of Maharashtra under Bharatmala Pariyojna on EPC Mode national highways authority of india•NHAI HQ•10-Dec-2020 | — | ₹806.87 Cr | — | Accepted-Technical | View |
| — | Four Lanning of NH-965G from km 83.500 (Indapur) to km 130.202 (Tondale) Design Length 46.702 km and One time improvement of selected stretches (Package-III) in the State of Maharashtra under Bharatmala Pariyojna on EPC mode national highways authority of india•NHAI HQ•10-Dec-2020 | — | ₹853.36 Cr | — | Accepted-Technical | View |
| — | Six Laning of Start of Kollam Bypass Km. 486.000 Kadambattukonam (Km. 517.250) sec of New NH 66 Old NH 47 in the State of Kerala on HAM under Bharatmala Pariyojana national highways authority of india•NHAI HQ•11-Dec-2020 | — | ₹1282.88 Cr | — | Admitted-Finance | View |
| — | 4-laning of Balwara to Dhangaon section of NH-347BG-753L (Indore to Boregaon-Pkg III) Design Ch.42.260-Existing Ch.45.000 to Design Ch.82.810-Existing Ch.86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on EPC mode national highways authority of india•NHAI HQ•16-Dec-2020 | — | ₹770.48 Cr | — | Accepted-Technical | View |
| — | Six laning from Kappirikkad to Thalikulam section of NH 66 old NH 17 from Design Ch.335.850 Ex.km 349.260 to Design Chainage 369.015 Ex.km 382.300 in Kerala on HAM under BMP national highways authority of india•NHAI HQ•28-Dec-2020 | — | ₹1168.19 Cr | — | Admitted-Finance | View |
| — | Six laning from Thalikulam to Kodungallur secton of NH 66 (old NH 17)from Design Ch. 369.015 (Ex. km 382.300) to Design Chainage 397.750 (Ex.km411.850) in Kerala on HAM under BP. national highways authority of india•NHAI HQ•11-Jan-2021 | — | ₹1231.70 Cr | — | Admitted-Finance | View |
| — | Development of Memmadpur (Ambala) - Banur (IT City Chowk) -Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹789.29 Cr | — | Admitted-Finance | View |
| — | Construction of 4 by 6 lane Greenfield Ludhiana Rupnagar NH205K from junction with NE-5 near to Manewal Ludhiana to junction with NH 205 near Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg-3 national highways authority of india•NHAI HQ•15-Jan-2021 | — | ₹1162.11 Cr | — | Admitted-Finance | View |
| — | Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Junction of EPE near Khekra Design Chainage 0 to Design Chainage 27.000 (Vill.-Lohadda) on EPC Mode (Package-1). national highways authority of india•NHAI HQ•18-Jan-2021 | — | ₹750.00 Cr | — | Admitted-Finance | View |
| — | Development of Six Lane Boriguma - Dasamantpur Section of NH-130-CD Road from km 249.000 to km 293.000 under Raipur-Visakhapatnam Economic Corridor in the state of Odisha on HAM (Package OD-5) national highways authority of india•NHAI HQ•18-Jan-2021 | — | — | — | Admitted-Finance | View |
| — | Development of Six Lane Koraput- Pattangi Section of NH-130 CD Road from km 293.000 to km 338.500 under Raipur-Visakhapatnam EC in Chhattisgarh on HAM(Package OD-6) national highways authority of india•NHAI HQ•18-Jan-2021 | — | ₹1121.55 Cr | — | Admitted-Finance | View |
| — | Development of 6 lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under BMP from Design Chainage 82.000 Vill-Khyawari to Design Chainage 119.068 (Vill-Latifpur at Saharanpur Bypass) in UP on EPC Mode (Package-IV) national highways authority of india•NHAI HQ•19-Jan-2021 | — | ₹835.70 Cr | — | Admitted-Finance | View |
| — | Construction of 4by6 lane Greenfield Ludhiana Rupnagar NH 205K from junction with NE5 near to Manewal Ludhiana to junction with NH205 Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg2 of total length 46.80 national highways authority of india•NHAI HQ•19-Jan-2021 | — | ₹992.71 Cr | — | Admitted-Finance | View |
| DQ | Construction of Eight lane access controlled Expressway from Km 3.000-Km 20.200 (Shirsad to Akloli Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XIV) national highways authority of india•NHAI HQ•29-Jan-2021 | — | ₹1122.76 Cr | — | Rejected-Technical | View |
| DQ | Construction of Eight lane access controlled Expressway from Km 20.200-Km 43.000 (Akloli to Amne Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XV) national highways authority of india•NHAI HQ•29-Jan-2021 | — | ₹1215.30 Cr | — | Rejected-Technical | View |
| — | Construction of Eight lane access controlled Expressway from Km 43.000 to Km 69.800 (Amne to Bhoj Section-SPUR of Vadodara Mumbai Expressway) on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XVI) national highways authority of india•NHAI HQ•29-Jan-2021 | — | ₹1685.73 Cr | — | Admitted-Finance | View |
| L1 | Construction of 4 lane Connector from Delhi Meerut Expressway (Km. 50.000 of Package IV) to Km. 8.520 of NH 235 in the State of Uttar Pradesh on EPC Mode (Length 14.600 Km). national highways authority of india•NHAI HQ•11-Mar-2021 | ₹368.00 Cr | — | — | Awarded (L1) | View |
| — | Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II) national highways authority of india•NHAI HQ•01-Apr-2021 | — | ₹693.70 Cr | — | Admitted-Finance | View |
| — | Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III). national highways authority of india•NHAI HQ•01-Apr-2021 | — | ₹633.03 Cr | — | Admitted-Finance | View |
| — | Development of Jakh (Vijaypur)Kunjwani section of NH-44 to 6-lane Exp standards as part of Delhi-Amritsar-Katra Exp. Design Km 503.200 to Km 515.000 of Ch. 0 to 7.385 of NH-144A Spur Connectivity to Jammu Airport on HAM under BMP in the UT of JK national highways authority of india•NHAI HQ•13-May-2021 | — | ₹1751.34 Cr | — | Admitted-Finance | View |
| — | Four Laning of the Project Highway from End of Pinjore bypass Baddi Nalagarh Section Km 4.200 to 35.395 of NH21A New NH105 in Haryana and Himachal Pradesh on the EPC Mode national highways authority of india•NHAI HQ•28-May-2021 | — | ₹731.67 Cr | — | Admitted-Finance | View |
| L1 | Strengthening and Improvement of existing 2 and 4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis. national highways authority of india•Sonipat•24-Jun-2021 | ₹18.90 Cr | — | — | Awarded (L1) | View |
| L1 | Improvement of Dharuhera Bhiwadi link road (NH-919, Old NH-71B) to 4 Lane with Service Road, starting from NH 48 (km 67.820) upto km 22.400 of NH-919 (4.3 km length) in Haryana national highways authority of india•NHAI HQ•01-Jul-2021 | ₹77.40 Cr | ₹117.07 Cr | -33.89% | Awarded (L1) | View |
| — | Strengthening Major Maintenance work of Chhindwara Soaner Sec and Chhindwara ring Rd 133.222 km, Chhindwara Amarwara Narsinghpur Sec 113.000 km, Chhindwara Multai and Sonakhar Seoni sec 136.877 km of NH347 and NH547 in MP and Maharashtra on EPC national highways authority of india•NHAI HQ•15-Jul-2021 | — | ₹412.49 Cr | — | Admitted-Finance | View |
| — | Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode national highways authority of india•NHAI HQ•04-Aug-2021 | — | ₹621.45 Cr | — | Admitted-Finance | View |
| — | Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode national highways authority of india•NHAI HQ•13-Aug-2021 | — | ₹607.46 Cr | — | Admitted-Finance | View |
| DQ | Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from 209.827 to km. 249.525 (PKG-II) in the State of Bihar under Bharatmala national highways authority of india•NHAI HQ•13-Aug-2021 | — | ₹759.74 Cr | — | Rejected-Technical | View |
| — | Upgradation of Existing 2Lane Carriageway to 4Lane Divided Carriageway from Ch.179.780 (Existing Km.506.660) in Bitada or Movi in Netrang Taluka to Ch.208.900 (Existing Km. 535.930) in Nasarpore in Umarpada Taluka Sec of NH56 in Gujarat on HAM PKG-5 national highways authority of india•NHAI HQ•01-Oct-2022 | — | ₹616.76 Cr | — | Admitted-Finance | View |
| — | Construction of 4 Lane Bypass to NH114A Connecting NH333 and NH133(Deoghar Bypass) frm design km 0.000 to design Km 49.000(Total Length 49.000 km)in the state of Jharkhand on HAM national highways authority of india•NHAI HQ•02-Dec-2022 | — | ₹1047.69 Cr | — | Admitted-Finance | View |
| — | Construction of 4/6 lane Southern Ayodhya Bypass from km. 5.000 to km. 37.172 (starting near km. 112.540, ending at km. 153.281 of NH27) of total length of 32.172 km. on HAM basis under NHDP Ph-VII in the state of Uttar Pradesh national highways authority of india•NHAI HQ•23-Dec-2022 | — | ₹1845.88 Cr | — | Admitted-Finance | View |
| — | 4L of NH530B from Chandan Nagar(Existing Km96.200 of NH530B Design Km.179.500) to Bareilly Bypass(End)(Existing Km267.000 of NH30 Design Km227.680) including Trumpet Interchange at end connecting NH30 in Uttar Pradesh on HAM(Pkg4) national highways authority of india•NHAI HQ•15-Jun-2023 | — | ₹1203.55 Cr | — | Admitted-Finance | View |
| — | Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode national highways authority of india•NHAI HQ•15-Jun-2023 | — | ₹438.62 Cr | — | Admitted-Finance | View |
| — | 6-laning with service road on both sides of Ayodhya Bypass section of NH-46 from design km 0.000 near Ashram Tiraha to design km 16.500 at Ratnagiri Tiraha (Design Length 16.500 km) under NH (O) in Madhya Pradesh on HAM national highways authority of india•NHAI HQ•05-Oct-2023 | — | ₹1097.25 Cr | — | Admitted-Finance | View |
| — | Const work of 4laning of Budhni to Badi sec of NH146B from design km 82.882 to design km 150.712 (Design Length 67.83 km) under NH(O) in the State of Madhya Pradesh on HAM. national highways authority of india•NHAI HQ•06-Oct-2023 | — | ₹870.80 Cr | — | Admitted-Finance | View |
| — | Const of 4Lane CG/JH Border Gumla Bharda sec of NH43 from design ch.0.000 (Vill. Katkaiya) to design ch. 32.370 (Vill. Bharda) in the State of Jharkhand on HAM under Bharatmala Pariyojana national highways authority of india•NHAI HQ•11-Oct-2023 | — | ₹948.31 Cr | — | Admitted-Finance | View |
| — | Four Laning between Existing Km 55.000-Design Km 59.000 (Kuru) to Existing Km 96.470-Design km 97.600 (Udaipura) on NH-75 (New NH-39) Sec-I in the state of Jharkhand on HAM mode (Package-I) national highways authority of india•NHAI HQ•17-Oct-2023 | — | ₹996.30 Cr | — | Admitted-Finance | View |
| — | Development of 6 lane green field (Package-IIA) starts from Design Ch.23.325 to Design ch.32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode national highways authority of india•NHAI HQ•08-Nov-2023 | — | ₹737.07 Cr | — | Admitted-Finance | View |
| — | Construction work of 4-laning of Shahganj bypass end to Badi (Package-IV) of NH-146B from design km 102.000 to design km 142.357 (Design length 40.357 km) under NH (O) in the State of Madhya Pradesh on Hybrid Annuity Mode national highways authority of india•NHAI HQ•15-Dec-2023 | — | ₹613.62 Cr | — | Admitted-Finance | View |
| — | Construction of 4L from Amjhar Road to Barela (Jabalpur Ring Road Pkg 5) from design km 98.950 (Near Amjhar) to km 113.925 and km 0.000 to Km 2.900 (Near Barela) (Total design Length 17.875 km) under NH(O) in Madhya Pradesh on HAM national highways authority of india•NHAI HQ•15-Dec-2023 | — | ₹442.57 Cr | — | Admitted-Finance | View |
| — | 4laning of Aligarh Palwal Sec from Km.0.00 (Starting from junction of NH-34 Aligarh)to Km.46.390 PKG I from (Khereshwar Junction Kurana)of NH-334D Inclu Khair n Jattari Bypass in UP on HAM national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹1009.28 Cr | — | Admitted-Finance | View |
| DQ | 4laning of Aligarh Palwal Sec from Km.46.390 (DC) to Km. 69.110(Terminating at junc EPE)(PKG-II from Kurana Eastern Peripheral Expressway)of NH334D in Uttar Pradesh and Haryana on HAM national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹573.38 Cr | — | Rejected-Technical | View |
| — | Const of 2Lane GF Bypasses in Lalganj Ajhara Mohanganj and Raniganj on Raebareli Jaunpur Sec of NH31 in the State of Uttar Pradesh on HAM. national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹566.45 Cr | — | Admitted-Finance | View |
| — | Four Lane with Paved Shoulders from Design Ch. 43.800 to Design Ch. 89.900 in Belgaum Hungund Raichur Section of NH748A in Karnataka on HAM Under NH(O) (Project Length 46.100 kms) (Package 2) national highways authority of india•NHAI HQ•28-Dec-2023 | — | ₹850.37 Cr | — | Admitted-Finance | View |
| — | 4laning of Agra Aligarh Sec from Km.0.000 (junc of NH34 Aligarh)to Km.28.000(near Asroi vill in Hathras)in UP on HAM mode under NH(O)Scheme (PKG-I). national highways authority of india•NHAI HQ•27-Dec-2023 | — | ₹562.32 Cr | — | Admitted-Finance | View |
| DQ | Construction of 4 lane Elevated corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in Jharkhand national highways authority of india•NHAI HQ•29-Dec-2023 | — | ₹690.05 Cr | — | Rejected-Technical | View |
| — | Construction of 4 lane with paved shoulders from Design Ch. 0.00 to Design Ch. 43.80 in Belgaum Hungund Raichur section of NH748A in Karnataka on HAM under NH(O) Project Length 43.80 Kms (Package-1) national highways authority of india•NHAI HQ•29-Dec-2023 | — | ₹848.24 Cr | — | Admitted-Finance | View |
| — | Const of 4lane Pathalgaon KunkuriCG/JH border sec of NH43 starting from end point of NH130A design Ch.00.000 to Ch. 104.250 (from Turua Ama vill to Putrichoura vill)under Bmp (Lot5 Pkg7)in the state of Chhattisgarh on HAM national highways authority of india•NHAI HQ•05-Mar-2024 | — | ₹2382.07 Cr | — | Admitted-Finance | View |
| — | Construction of 4lane Greenfield Northern Patiala Bypass starting from Km. 274.115 of NH7 near village Wazidpur and terminating at Km. 300.465 of NH7 near village Chamarheri (Total length 27.350 Kms) in Punjab under NH(O) on Hybrid Annuity Mode national highways authority of india•NHAI HQ•07-Mar-2024 | — | ₹764.43 Cr | — | Admitted-Finance | View |
| — | 6 laning with service road on both sides of Ayodhya Bypass section of NH 46 from design km 0.000 near Ashram Tiraha to design km 16.500 at Ratnagiri Tiraha (Design Length 16.500 km) under NH (O) in Madhya Pradesh on Hybrid Annuity Mode national highways authority of india•NHAI HQ•15-Mar-2024 | — | ₹1048.90 Cr | — | Admitted-Finance | View |
| — | Construction of 6 lane connectivity to Visakhapatnam Port Road from Km 0.000 (Sabbavaram bypass of Anakapalli Anandapuram corridor)to Km12.660 (Sheelanagar junc)of NH 516C on HAM in Andhra Pradesh under NH(O) national highways authority of india•NHAI HQ•05-Jul-2024 | — | ₹638.22 Cr | — | Admitted-Finance | View |
| — | Construction and Upgradation to Four Lane from Manikpur (Design.Ch. Km 0.000) to Sahebganj (Design. Ch. Km 44.650) section of NH139W in the State of Bihar on HAM Mode (2nd call) national highways authority of india•NHAI HQ•16-Jul-2024 | — | ₹1049.57 Cr | — | Admitted-Finance | View |
| — | Construction of 6 lane Greenfield corridor from Ramnagar to Kacchi Dargah NH119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode national highways authority of india•NHAI HQ•16-Jul-2024 | — | ₹465.46 Cr | — | Admitted-Finance | View |
| — | CONSTRUCTION OF 4LANING OF KISHANGANJ-BAHADURGANJ SECTION AS A SPUR CONNECTIVITY NH-27 AND NH-327E UTTAR RAMPUR (0.0) AND TERMINATING AT NH-327E NEAR VILLAGE SATAL ISTMARAR BAHADURGANJ (23.649) AND INTERCHANGE AT START POINT IN BIHAR ON HAM (2nd call national highways authority of india•NHAI HQ•23-Jul-2024 | — | ₹788.12 Cr | — | Admitted-Finance | View |
| — | Const of 4/6 Lane Highway of Southern Bareilly Bypass (L29.920km)starting at Ch.237.000 of NH 530 near Jhumka chauraha Dhantiya vill and ending at Ch267.000 of NH 30 near Invertis University inc Trumpet Interchange on HAM basis in the Uttar Pradesh national highways authority of india•NHAI HQ•31-Jul-2024 | — | ₹937.20 Cr | — | Admitted-Finance | View |
| — | Construction of New four lane Sambalpur Bypass from Km 0.000 to Km 35.384 under NH(O) on Hybrid Annuity Mode in the state of Odisha. national highways authority of india•NHAI HQ•26-Sep-2024 | — | ₹1086.73 Cr | — | Admitted-Finance | View |
| — | Construction work of 4-laning of Sandalpur to Nasrullaganj bypass end PkgI of NH-146B from design km 0.000 to design km 43.250 (DL 43.250 km) under NH(O) in Madhya Pradesh on Hybrid Annuity Mode national highways authority of india•NHAI HQ•03-Dec-2024 | — | ₹941.19 Cr | — | Admitted-Finance | View |
| — | Four laning of Kolhapur Sangli section of NH-166 from Sangli Phata (km 0.00) to Chokak (km 7.738) and Chokak (km 145.300) to Ankali (km 171.171) (DL 33.609 km in Maharashtra to be executed on HAM under NH (O). national highways authority of india•NHAI HQ•16-Jan-2025 | — | ₹758.75 Cr | — | Admitted-Finance | View |
| — | Construction of 4 lane Western Bypass of Gwalior from Km 0.000 to Km 28.516 in the State of Madhya Pradesh on HAM Mode. national highways authority of india•NHAI HQ•21-Jan-2025 | — | ₹792.48 Cr | — | Admitted-Finance | View |
| — | Const. of Service Road including Grade Sep. str. at specified junctions for improvement of corridor eff. of Domel Udhampur sec. of NH44 from Ch 220.500 to 182.200, length 14.370 Km on LHS and length 10.890 Km on RHS in the UT of JK on EPC Mode. national highways authority of india•Domel Udhampur•04-Feb-2025 | — | ₹275.00 Cr | — | Accepted-Technical | View |
| DQ | Develop. of 6lane GF PKG-IIA starts from Ch.23.325 to Design ch. 32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode (2ND CALL) national highways authority of india•NHAI HQ•22-Apr-2025 | ₹603.50 Cr | ₹736.84 Cr | -18.1% | Awarded: Transrail Lighting Limited | View |
| — | Construction of 2 no. of Grade separated interchanges at Km 113.730 (Ranchi-Hazaribagh Road) and Km 139.225 (Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in Jharkhand on EPC Mode under NH(O).(Total Length 6.06 km)-2nd call national highways authority of india•NHAI HQ•15-May-2025 | — | ₹218.86 Cr | — | Admitted-Finance | View |
| DQ | Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH7 (Design Chainage 501.930 to 531.330) and Nepali Farm Motichur Section of NH34 (DC 531.330 to 538.750) on EPC Mode in Uttarakhand under NH(O) national highways authority of india•NHAI HQ•28-May-2025 | ₹364.64 Cr | ₹558.43 Cr | -34.7% | Awarded: S S BUILDERS | View |
| L6 | Four Laning of Benordem Start of Canacona Bypass and End of Canacona Bypass to Pollem) on NH-66 in the State of Goa on Hybrid Annuity Mode. ministry of road transport and highways•Canacona•28-Nov-2024 | ₹693.00 Cr | ₹952.23 Cr | -27.22% | Admitted-Finance | View |
| L8 | Four Laning of Navelim to Cuncolim Section of NH-66 from Km 554.245 to Km 561.480 in the State of Goa on Hybrid Annuity Mode. ministry of road transport and highways•Navelim•16-Dec-2024 | ₹540.70 Cr | ₹518.66 Cr | +4.25% | Admitted-Finance | View |
| DQ | Construction of Champawat Bypass with two lane with paved shoulder configuration starting from existing chainage 121.700 to existing chainage 129.450 (Design Length 9.847) of NH-125 in District-Champawat in the state of Uttrakhand on EPC ministry of road transport and highways•Champawat Bypass•24-Mar-2025 | ₹111.06 Cr | ₹153.77 Cr | -27.78% | Rejected-Finance | View |
| L3 | WIDENING AND IMPROVEMENT OF SHANGSHAK-TENGNOUPAL ROAD PKG-3 (FROM KM. 78.250 TO KM. 126.250) OF NH-102A INTO 2 LANE WITH HARD SHOULDER IN THE STATE OF MANIPUR UNDER ANNUAL PLAN 2024-25 THROUGH EPC MODE (Job No. 102A/MN/2024-25/42) ministry of road transport and highways•Kamjong•23-May-2025 | ₹273.60 Cr | ₹429.94 Cr | -36.36% | Admitted-Finance | View |
| DQ | Construction of Operation water storage pond (OSP) and other associated/ miscellaneous works for Gorakhpur Haryana Anu Vidyut Pariyojana-1 and2 (GHAVP-1and2) at Vill. Gorakhpur, Distt. Fatehabad, Haryana. nuclear power corporation of india limited•GHAVP Site•22-Aug-2024 | — | ₹349.51 Cr | — | Awarded: GHV (India) PVT. Ltd. | View |
| DQ | Development of New Greenfield Airport at Bundi, Kota Rajasthan. SH-Airside Works airports authority of india•Kota•06-Feb-2025 | ₹349.02 Cr | ₹467.67 Cr | -25.37% | Awarded: KCC Buildcon Private Limited | View |
| DQ | Development of Lal Bahadur Shastri International Airport Varanasi airports authority of india•Varanasi Airport•09-May-2025 | ₹338.90 Cr | ₹456.97 Cr | -25.84% | Awarded: PNC Infratech Ltd | View |