Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
BI
Government ContractorVerified Bidding RecordPublic Works

BNA INFRASTRUCTURE PVT LTD

Aggregated public procurement dossier compiling official financial evaluations, competitive bidding ranks (L1, L2, L3), and tender awards.

Historical Win Rate3 Wins
10.3%award ratio

3 awarded across 29 participated tenders

Primary Issuing Authorities:ministry of road transport and highwaysnational highways authority of indiaircon international limitedairports authority of india
Official Central e-Procurement Evaluation Data

Total Tenders Bidded

29

Evaluated bids submitted

Official L1 Wins

3

Lowest responsive bidder

Won Contracts Value

₹139.72 Cr

Cumulative awarded volume

Total Quoted Pipeline

₹2161.38 Cr

Aggregated financial quotes

Competitive Position & Rank Distribution

Historical rank distribution across technical evaluations and financial openings

Average Margin vs Estimate: -10.63%
Bidding Outcome Proportion29 Total Evaluated Bids
L110.3%

3

Winning Bid

L23.4%

1

Runner Up

L36.9%

2

3rd Lowest

L4+20.7%

6

Higher Ranks

DQ13.8%

4

Disqualified

Profile Summary & Procurement Overview

BNA INFRASTRUCTURE PVT LTD is an active participant in public government e-procurement tenders. Across documented records, the contractor has placed financial quotes for 29 distinct tenders, achieving the lowest conforming bid position (L1) on 3 tenders with a historical win rate of 10.3%.

The contractor has executed or been awarded project works amounting to ₹139.72 Cr. In competitive bidding assessments, the firm has also finished as the secondary bidder (L2) in 1 tenders. Primary issuing authorities include ministry of road transport and highways, national highways authority of india, ircon international limited, airports authority of india.

Tender Bidding Archive & Historical Records

Evaluation records and financial bids submitted by BNA INFRASTRUCTURE PVT LTD

RankTender & AuthorityQuoted BidEstimated CostMarginOutcomeLink
DQConstruction of 2Lane ROB on Raipur to Mahasamund road from Ch. 1800 to 2800 of NH353 old NH217 at LC No. RV30 on Raipur Vishakhapatnam Railway Line near Belsonda in the state of Chhattisgarh
ministry of road transport and highwaysMahasamund27-Jul-2023
₹46.28 CrRejected-TechnicalView
L5Upgradation of Sarvardewla to Pal (MP/MH Border) Road section of NH-347C from Design Chainage 81.600 to 137.400 Km (Total length 55.80km) to 2 lane with paved shoulder configuration along with OTI of 1.95 km in the State of Madhya Pradesh on EPC mode
ministry of road transport and highwaysSarvardewla to Pal Road section of NH-347C25-Aug-2023
₹287.96 Cr₹334.83 Cr-14%Admitted-FinanceView
L6Construction of New 2Lane Bridge over Purna River at Ch. 18.100 (605.545) including approaches from 17.575 to 19.011 in Shegaon Deori fata section of NH548C in the Sate of Maharashtra on EPC mode
ministry of road transport and highwaysPurna Bridge11-Dec-2023
₹66.77 Cr₹76.05 Cr-12.2%Admitted-FinanceView
Rehabilitation and Upgradation of NH 753B from Nandurbar to Taloda (Km. 49.050 to Km. 78.270) to 4 LPS in the States of Maharashtra/Gujarat on EPC mode.
ministry of road transport and highwaysNandurbar20-Dec-2023
₹608.47 CrAccepted-TechnicalView
REHABILITATION UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH161A (AKOLA AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.
ministry of road transport and highwaysGandhigram21-Dec-2023
₹50.10 CrAdmitted-Fee/PreQual/TechnicalView
L3REHABILITATION UPGRADATION TO 2LPS FOR GANDHIGRAM REALIGNMENT WITH MAJOR BRIDGE FROM CH. 24.250 to CH. 27.200 (TOTAL LENGTH 2.95 KM) ON NH-161A (AKOLA-AKOT SECTION) IN THE STATE OF MAHARASHTRA ON EPC MODE.
ministry of road transport and highwaysGandhigram16-Feb-2024
₹49.69 Cr₹50.10 Cr-0.82%Admitted-FinanceView
L2Construction of New High level Major Bridge on Katepurna River at design chainage 133.450 along with approaches of 640 m from Km. 133.025 to Km. 133.875 on on Jalna- Pulgaon Road NH753C (total Length 850 m) Tal. Malegaon, Dist. Washim on EPC mode in
ministry of road transport and highwaysMalegaon dist washim13-Feb-2024
₹34.12 Cr₹30.11 Cr+13.31%Admitted-FinanceView
L1Construction of ROB at LC 115B near Nastanpur at Km 126.150 of Nandgaon Chalisgaon section of NH 753J in the state of Maharashtra on EPC mode
ministry of road transport and highwaysNH 753J16-Jan-2024
₹63.70 Cr₹79.31 Cr-19.68%Awarded (L1)View
One Time Maintenance and Improvement of existing road passing through Varangaon City -Km.387.500 to Km.390.400 on Chikhali -Tarsod (Package-IIA) Section of NH-53 in the State of Maharashtra
national highways authority of indiaNHAI RO Nagpur13-May-2022
Admitted-FinanceView
L1Repair and Maintenance of NH-753BE starting from its junction with NH-753B Taloda connecting Shahada- Shirpur- Chopda- Yawal- Raver upto Maharashtra and Madhya Pradesh Border in the State of Maharashtra (Length 232.200 Km.) on Item Rate Basis
national highways authority of indiaNHAI RO Nagpur02-Mar-2023
₹74.58 CrAwarded (L1)View
Upgrad upto 4lane of sec NH146 from DC km 124.470 EC km 148.180 near Rahatgarh DC km 134.549 EC km 158.435 near Berkhedi in Madhya Pradesh on HAM under Bharatmala Economic Corridor 4 PL 10.079 km
national highways authority of indiaNHAI HQ20-Jan-2025
₹505.95 CrAdmitted-FinanceView
DQStrengthening-rehabilitation of rigid and flexible pavement with flexible overlay (50.93 km) and reconstruction (13.33 km) along with 04 years routine maintenance of Bhopal-Biaora section from Km.324 to Km.394.923 of NH-46 in MP on Item Rate Basis
national highways authority of indiaNHAI HQ18-Dec-2025
₹215.04 CrRejected-TechnicalView
DQProfile raising and strengthening of existing flexible pavement including flexible overlay (2.12 km) and reconstruction (22.817 km) along with 04years routine maintenance of Bhopal-Biaora section from Km.394.923-Km.421.450 of NH-46 in MP on Item Rate
national highways authority of indiaNHAI HQ18-Dec-2025
₹166.01 CrRejected-TechnicalView
Strengthening of existing Faizpur to Savda town portion in a length of 14.230 km from km 189.240 to km 204.500 on NH 753BE in the State of Maharashtra on EPC Mode
national highways authority of indiaNHAI RO NAGPUR06-Jan-2026
₹65.06 CrAccepted-TechnicalView
Strengthening of existing Vivre Village to Raver town portion in a length of 11.000 km from km 209.100 to km 220.100 on NH 753BE in the State of Maharashtra on EPC Mode
national highways authority of indiaNHAI RO NAGPUR06-Jan-2026
₹51.24 CrAccepted-TechnicalView
Strengthening of existing Raver Town to MH/MP Border portion in a length of 11.100 km from km 220.100 to km 231.200 on NH-753BE in the State of Maharashtra on EPC Mode
national highways authority of indiaNHAI RO NAGPUR06-Jan-2026
₹50.62 CrAccepted-TechnicalView
Construction of (a) Major Bridge at km 437.600 over Girna River including maintenance of existing Girna River bridge(b)White Topping from km 428.057 to km 435.907(c) construction of RCC Cover Drain on NH53 in the State of Maharashtra on EPC
national highways authority of indiaNHAI RO NAGPUR17-Jan-2026
₹79.23 CrAccepted-TechnicalView
DQConst of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
national highways authority of indiaNHAI HQ28-Jan-2026
₹275.39 CrRejected-TechnicalView
Construction of 2Nos of VUPs at km 462.100 and km 483.800 as remedial measures for rectification of accident spots on Tarsod to Fagne Section of NH-53 in the State of Maharashtra on EPC mode under RO NAGPUR.
national highways authority of indiaNHAI RO NAGPUR14-Feb-2026
₹80.66 CrAccepted-TechnicalView
L10Four Laning of Navelim to Cuncolim Section of NH-66 from Km 554.245 to Km 561.480 in the State of Goa on Hybrid Annuity Mode.
ministry of road transport and highwaysNavelim16-Dec-2024
₹597.00 Cr₹518.66 Cr+15.1%Admitted-FinanceView
L10Construction of ROB with approaches in lieu of Railway crossing LC 20 on NH 161H at km 24.913 in the state of Maharashtra on EPC mode
ministry of road transport and highwaysNandura15-May-2025
₹111.77 Cr₹149.32 Cr-25.15%Admitted-FinanceView
RFP for Construction of 4 Laning of NH-727 from Km. 4.115 to km 23.800 i/c Padrauna bypass and 2 lane with ps from km 23.800 to km 46.500 along with One time improvement in 28.50 km on project realignment/bypass) on (HAM) basis in the State of U.P.
ministry of road transport and highwaysKushinagar to Padrauna29-May-2026
₹838.38 CrAdmitted-Fee/PreQual/TechnicalView
L3Widening to 2 Lane with Paved Shoulder of Raipur-Jassakhera section (Km 0.000 to Km 29.770) of NH-458 on EPC mode in the State of Rajasthan
ministry of road transport and highwaysNew Delhi18-Jul-2025
₹421.20 Cr₹484.57 Cr-13.08%Admitted-FinanceView
L8Construction of 4 Lane with PS Idar-Badoli bypass section from Design km 81/300 to km 95/500 of NH 168-G in the State of Gujarat (Total length 14.200 km) on EPC mode.
ministry of road transport and highwaysNew Delhi18-Jul-2025
₹294.00 Cr₹426.80 Cr-31.12%Admitted-FinanceView
L8Construction of Keonchi Ratanpur Road of NH45 (from Design Ch. km 0.000 to km Ch. 5.275) (Pkg03 Design Length 5.275km) to Four Lane with paved shoulder configuration on Engineering, Procurement and Construction Mode in the State of Chhattisgarh
ministry of road transport and highwaysBilaspur10-Dec-2025
₹159.15 Cr₹194.51 Cr-18.18%Admitted-FinanceView
Construction of 4 laning of Rishikesh Bypass from Design Chainage km 529.750 Near Teenpani Flyover on NH7 to Design Chainage km 542.420 Near Kharasrote Bridge passing through Bhattowala and Dhalwala Village in the State of Uttarakhand Design Length
ministry of road transport and highwaysRishikesh Bypass18-Apr-2026
₹735.23 CrAdmitted-Fee/PreQual/TechnicalView
EOI for assoc. as JV Partner from Exp. Agencies for PKG V2 A CONSTR. OF VIADUCT V2A 1x30.5 m OWG and 57x61 m OWG INCL. CONSTR. OF FOUNDATION, SUBSTRUCTURE... B/W CH. 82,657 TO 86,363... OF INDORE BUDNI... NEWBG LINE IN BHOPAL DIVISION OF WCR IN MP
ircon international limitedIndore, Madhya Pradesh23-Apr-2026
Admitted-Fee/PreQual/Technical/FinanceView
EOI for assoc. as JV Partner from Exp. Agencies for PKG V2B CONSTR. OF VIADUCT V2B 1x30.5 m OWG and 60x61 m OWG INCL. CONSTR. OF FOUNDATION, SUBSTRUCTURE... B/W CH. 86,363 TO 90,260... OF INDORE BUDNI... NEWBG LINE IN BHOPAL DIVISION OF WCR IN MP
ircon international limitedDewas, Madhya Pradesh23-Apr-2026
Admitted-Fee/PreQual/Technical/FinanceView
L1Construction of Link Taxi Track for Flying Training Organizations
airports authority of indiaAirports Authority of India Jalgaon Airport08-Oct-2021
₹1.44 Cr₹1.62 Cr-11.08%Awarded (L1)View

Frequently Asked Questions

How many government tenders has BNA INFRASTRUCTURE PVT LTD participated in?

According to public e-procurement data records, BNA INFRASTRUCTURE PVT LTD has participated in 29 government infrastructure and procurement tenders across central and state authorities.

How many tenders has BNA INFRASTRUCTURE PVT LTD won as lowest bidder (L1)?

BNA INFRASTRUCTURE PVT LTD has secured 3 tenders as the official lowest bidder (L1) or awardee, achieving an overall win rate of 10.3%.

What is the total value of government contracts awarded to BNA INFRASTRUCTURE PVT LTD?

The cumulative value of project contracts awarded to BNA INFRASTRUCTURE PVT LTD is approximately ₹139.72 Cr, across agencies such as ministry of road transport and highways, national highways authority of india, ircon international limited.

Explore more public procurement intelligence and infrastructure data: