Vendor Company Profile
KM
KRISHNA MOHAN TIWARI
Bihar Projects
3
Total Contract Value
₹17.13 Cr
Districts Active In
1
Registered State
—
3 Bihar Projects
1Comprehensive Operation and Maintenance and Special repair of Ward level Piped Water Supply Schemes constructed by the “Panchayati Raj Department” and handed over to PHED for four years; excluding the cost of energy charges and operator wages. in BLOCK :- Mahrajganj having Total No. of Scheme- 218 Nos. under P.H Division Siwan For the year 2024-25. Siwan ₹4.74 Cr2Construction, Supply, Testing, and Commissioning of Piped Water Supply Schemes (Ward level schemes) for habitations left out under "Har Ghar nal ka Jal" nischay yojna in panchayats where "Har Ghar nal ka jal" was executed by the Panchayati Raj Department with Electric Driven Pumps Block-Mairwa in the District of Siwan , Bihar on turn-key basis with 03 months Trial Run Period Under P.H. Division, Siwan during the year 2024-25.- Siwan ₹6.29 Cr3Design, Construction, Supply, Testing, and Commissioning of Piped Water Supply Schemes (Ward level schemes) for habitations left out under "Har Ghar nal ka Jal" nischay yojna in panchayats where "Har Ghar nal ka jal" was executed by the Panchayati Raj Department with Electric Driven Pumps Block- Nautan in the District of Siwan , Bihar on turn-key basis with 03 months Trial Run Period Under P.H. Division, Siwan during the year 2024-25. Siwan ₹6.10 Cr