Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Vendor Company Profile
AS

ANIL SINGH

Bihar Projects

3

Total Contract Value

₹21.66 Cr

Districts Active In

3

Registered State

3 Bihar Projects

1Design, Construction, Supply, Testing and Commissioning of 24 Nos. Ward Level Piped Water Supply Schemes for habitations left out (PRD) under “Har Ghar Nal Ka Jal” Nischay Yojna in areas having ground water quality issues; with Electric Driven Pumps in the District of Rohtas, Bihar on turn-key basis with 3 months Trial Run Period under Mukhyamantri Grameen Peyjal Nishchay Yojna (Non Quality Affected) of different habitation in Dawath Block in the District of Rohtas (Sasaram). Rohtas ₹3.22 Cr2Name of Work : Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes (WLS) with Electric Driven Pumps in Leftout Tola of PRD Panchayat taken over by Panchayati Raj Department in Patna District of Bihar on turn-key basis with 3 months Trial Run after Completion Period under Mukhmantri Nishchay (Non-Quality Affected) Yojna under P.H. Division, Patna East for the Year 2024-25. (Block:- Khushrupur (1). Panchayat:-Sukarbeg Chak, Habitation Ward No.4,10,11,12 (2). Panchayat:-Mosimpur, Habitation Ward No.5,7,9 (3). Panchayat:-Hardas Bigha Habitation Ward No.1,4A,4B,6,7A,7B,8,14 (4). Panchayat:-Alawalpur, Habitation Ward No.2,3,12A,12B,13). Patna ₹5.21 Cr3Design, Construction, Supply, Testing, commissioning of Water Supply Schemes with Electric Driven Pumps for Non-Quality PRD Handed over Schemes of Lakhisarai District of Bihar on turn-key basis with 3 months Trial Run after Commissioning under Mukhyamantri Nishchay (Non Quality Affected) Yojna Under P.H. Division, Lakhisarai . (Block- Lakhisarai & Surajgarha-1) Group NO- 1 Lakhisarai ₹13.23 Cr