Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Industrial Units384+ Approved|
Awarded Value₹24,500+ Cr|
MP Fund Utilization78% Average|
Highway Network1,200 km+|
Energy Stability23.5 Hrs/Day|
Active Projects842 Tracked|
Education Index+15.3% Trend|
Cabinet decisionsActive Tracking|
Airport movements3.2M+ Annual|
EC MonitoringLive Updates|
Litigation tracker480+ Cases|
Central Government TenderExpired

Construction of New Domestic terminal building and miscellaneous works at Hubballi Airport Provision of Baggage Handling System BHS SH Design and SITC of Non Inline type Departure conveyor system for 14 nos Check in Counters and 03 Nos Heavy Du

Issued by: Airports Authority of India
Location: Hubballi Airport
Central Government Tender○ Closed
Ref. NoAAI/CHQ/ENGG (E)/ Hubballi -BHS/2025-26
Est. Value₹8.26 Cr
Deadline18-Aug-2025 06:00 PM
TypeOpen Tender
Hubballi Airport
Published 17-Jul-2025 06:55 PM

Tender Details

OrganisationAirports Authority of India
Reference No.AAI/CHQ/ENGG (E)/ Hubballi -BHS/2025-26
StatusExpired
LocationHubballi Airport
SourceCentral Govt. Portal
Status StageAOC

Financial & Timeline

Estimated Value₹8.26 Cr
Published Date17-Jul-2025 06:55 PM
Submission Deadline18-Aug-2025 06:00 PM
Submission Start18-Jul-2025 09:30 AM
Bid Opening Date22-Aug-2025 12:00 PM
Bid Opening PlaceNew Delhi
Pre-Bid Meeting25-Jul-2025 11:00 AM
Period of Work152 Days

Award of Contract (AOC) Details

Awardee / Contractor

Fox Solutions Private Limited

Award Date: 09-Oct-2025

Completion Period: 151 Days

Contract Financials & Scope

INR 58,737,454

Work Awared to L-1 agency ie M/s Fox Solutions Pvt. Plot no- 09, Amdad MIDC, Nashik, for Rs.5,87,37,454/ (SITC Cost Rs.3,68,96,740.51 + AICMC Cost Rs.73,19,383.98 + Operation Cost 1,45,21,329.60)

Contract Award Info Updated 07-Jan-2026 05:28 PM by Suresh Kumar

This airports tender covers construction of New Domestic terminal building and miscellaneous works at Hubballi Airport Provision of Baggage Handling System BHS SH Design and SITC of Non Inline type Departure conveyor system for 14 nos Check in Counters and 03 Nos Heavy Du, issued by Airports Authority of India under reference AAI/CHQ/ENGG (E)/ Hubballi -BHS/2025-26. The estimated contract value is ₹8.26 Cr, and The tender is currently Expired.

This procurement is part of ongoing efforts by central government agencies and public sector undertakings to maintain and upgrade public infrastructure and services in Hubballi Airport. Vendors interested in similar opportunities can browse other tenders from the same issuing organisation below.

Tender Documents & Downloads

technical_275570.pdf

Key: 2025_AAI_240694_1/technical_275570.pdf

Download File

techsummary_275570.pdf

Key: 2025_AAI_240694_1/techsummary_275570.pdf

Download File

BOQ Comparative Chart

Key: 2025_AAI_240694_1/BOQ Comparative Chart.xlsx

Download File

finsummary_275570.pdf

Key: 2025_AAI_240694_1/finsummary_275570.pdf

Download File

AOC.pdf

Key: 2025_AAI_240694_1/AOC.pdf

Download File

Tender Description

Design and SITC of Non Inline type Departure conveyor system for 14 nos Check in Counters and 03 Nos Heavy Duty Slat type Inclined Arrival conveyor system along with its Operation for 07 years and AICMC for 05years after 2years DLP at Hubballi Airpot

Submitted Bids & Bidder Details

DElite System Engineering (India) Pvt. Ltd.
#881920
Rejected-Finance
Submitted: 18-Aug-2025 05:22 PM
Fin. Value: 62036168.00
Fin. Rank: LL-2
Updated: 07-Oct-2025 02:28 PM

Being L-2

Fox Solutions Private Limited
#883831
Accepted-AOC
Submitted: 18-Aug-2025 02:35 PM
Fin. Value: 58737454.00
Fin. Rank: LL-1
Updated: 07-Jan-2026 05:30 PM

Became L-1 through open bid

PREMIER ENGINEERING TECHNICS PVT. LTD.
#878353
Rejected-Finance
Submitted: 18-Aug-2025 03:32 PM
Fin. Value: 64539280.00
Fin. Rank: LL-3
Updated: 07-Oct-2025 02:28 PM

Being L-3

Bid Evaluation Details & Logs

Technical

technical bid opening

Date: 28-Aug-2025 03:21 PM

Officer: Suresh Kumar

summary

technical evaluation

technical evaluation

Date: 29-Aug-2025 06:12 PM

Officer: Suresh Kumar

Finance

finance bid opening

Date: 03-Sep-2025 10:42 AM

Officer: Suresh Kumar

Financial bid opened on 01/09/2025

finance evaluation

finance evaluation

Date: 07-Oct-2025 02:28 PM

Officer: Suresh Kumar

About This Procurement Notice

This central government tender was issued by Airports Authority of India. The estimated contract value is ₹8.26 Cr. Bids must be submitted by 18-Aug-2025 06:00 PM.

BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.

Frequently Asked Questions

What is the status of the tender "Construction of New Domestic terminal building and miscellaneous works at Hubbal"?
The current status of this tender is "Expired". The submission deadline is 18-Aug-2025 06:00 PM. This information is sourced from official government procurement portals.
Who issued this Bihar government tender?
This tender was issued by Airports Authority of India. The reference number is AAI/CHQ/ENGG (E)/ Hubballi -BHS/2025-26. It is a central government procurement notice.
What is the estimated value of this tender?
The estimated tender value is ₹8.26 Cr. This is the approximate contract value as disclosed in the official tender document.