Replacement of False Floor in Technical Rooms and Expansion Joints at Platform Area from Samaypur Badli to Millennium City Centre Metro Station at Line-2 and Inderlok to Brigadiar Hosiyar Singh Metro Station at Line-5 under Asset Replacement Work.
Tender Specifications & Timeline
14 FieldsAward of Contract (AOC) Details
Awardee / Contractor
durga shakti construction private limited
Award Date: 02-Aug-2024
Completion Period: 365 Days
Contract Financials & Scope
INR 18,191,000
Contract Award Info Updated 02-Aug-2024 04:28 PM by Manvendra Singh
Total Bidders
1
Winning Bid (L1)
₹1.27 Cr
Estimated Value (PAC)
₹1.82 Cr
Margin vs Estimate
0.00%
Winning Contractor (L1 - Official Awardee)
Accepted-AOCCompletion Period
365 days
AOC Award Date
02-Aug-2024
| Rank | Bidder / Contractor | Quoted Bid | Gap vs L1 | vs Estimate | Status |
|---|---|---|---|---|---|
| L1 | ₹1.27 Cr | 0.0% (L1) | -30.19% | Accepted-AOC |
This metro rail tender covers replacement of False Floor in Technical Rooms and Expansion Joints at Platform Area from Samaypur Badli to Millennium City Centre Metro Station at Line-2 and Inderlok to Brigadiar Hosiyar Singh Metro Station at Line-5 under Asset Replacement Work., issued by Delhi Metro Rail Corporation Limited under reference OCW-1627. The estimated contract value is ₹1.82 Cr, and the tender is currently Expired. Following contract finalisation, the work was awarded to durga shakti construction private limited for a total value of ₹1.82 Cr.
This procurement is part of ongoing efforts by central government agencies and public sector undertakings to maintain and upgrade public infrastructure and services in New Delhi. Vendors interested in similar opportunities can browse other tenders from the same issuing organisation below.
Tender Documents
Download official tender documents, technical specifications, schedules, and BOQ files
technical_853251.pdf
techsummary_853251.pdf
finance_853251.pdf
BOQ Comparative Chart
finsummary_853251.pdf
1627-LOA.pdf
As per quoted rate
| Bidder | Submitted On | Status | Fin. Value | Rank | Remarks / Logs |
|---|---|---|---|---|---|
durga shakti construction private limited #3051190 | 14-Jul-2024 04:53 PM | Accepted-AOC Updated: 02-Aug-2024 04:28 PM | 1,26,98,846.97 | L1 | As per quoted rate |
Bid Evaluation Details & Logs
technical bid opening
Date: 16-Jul-2024 03:16 PM
Officer: Krishan Kumar Sharma
All documents downloaded successfully.
technical evaluation
Date: 25-Jul-2024 02:52 PM
Officer: Manvendra Singh
finance bid opening
Date: 25-Jul-2024 03:04 PM
Officer: Krishan Kumar Sharma
All documents downloaded successfully.
finance evaluation
Date: 02-Aug-2024 04:27 PM
Officer: Manvendra Singh
About This Procurement Notice
This central government tender was issued by Delhi Metro Rail Corporation Limited. The estimated contract value is ₹1.82 Cr. Bids must be submitted by 15-Jul-2024 02:00 PM.
BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.
Frequently Asked Questions
- QWhat is the status of the tender "Replacement of False Floor in Technical Rooms and Expansion Joints at Platform A"?
- The current status of this tender is "Expired". The submission deadline is 15-Jul-2024 02:00 PM. This information is sourced from official government procurement portals.
- QWho issued this central government tender?
- This tender was issued by Delhi Metro Rail Corporation Limited. The reference number is OCW-1627. It is a central government procurement notice.
- QWhat is the estimated value of this tender?
- The estimated tender value is ₹1.82 Cr. This is the approximate contract value as disclosed in the official tender document.
- QWho won the contract for this tender?
- The contract for "Replacement of False Floor in Technical Rooms and Expansion Joints at Platform Area from Samaypur Badli to Millennium City Centre Metro Station at Line-2 and Inderlok to Brigadiar Hosiyar Singh Metro Station at Line-5 under Asset Replacement Work." was awarded to durga shakti construction private limited with an awarded contract value of ₹1.82 Cr.
- QWhat is the final awarded contract value?
- The final awarded contract value is ₹1.82 Cr (0% above the estimated PAC of ₹1.82 Cr).