Construction of New Operational Control Centre (OCC) at 3rd floor in Metro Bhawan at Barakhamba Road, New Delhi
Tender Specifications & Timeline
13 FieldsAward of Contract (AOC) Details
Awardee / Contractor
BHAVAN ENTERPRISES
Award Date: 09-Sep-2022
Completion Period: 270 Days
Contract Financials & Scope
INR 31,089,000
Contract Award Info Updated 09-Sep-2022 05:50 PM by Manvendra Singh
Total Bidders
3
Winning Bid (L1)
₹3.66 Cr
Estimated Value (PAC)
₹3.11 Cr
Margin vs Estimate
0.00%
L1 to L2 Spread
+19.36%
Completion Period
270 days
AOC Award Date
09-Sep-2022
| Rank | Bidder / Contractor | Quoted Bid | Gap vs L1 | vs Estimate | Status |
|---|---|---|---|---|---|
| L1 | BHAVAN ENTERPRISES#2627836 | ₹3.66 Cr | 0.0% (L1) | +17.78% | Accepted-AOC |
| L2 | PRAGATI CONSTRUCTION CONSULTANTS#2629296 | ₹3.71 Cr | +19.36% | Rejected | Rejected-AOC |
| L3 | MODTECH#2627839 | ₹3.83 Cr | +23.04% | Rejected | Rejected-AOC |
This metro rail tender covers construction of New Operational Control Centre (OCC) at 3rd floor in Metro Bhawan at Barakhamba Road, New Delhi, issued by Delhi Metro Rail Corporation Limited under reference OCW-1141. The estimated contract value is ₹3.11 Cr, and the tender is currently Expired. Following contract finalisation, the work was awarded to BHAVAN ENTERPRISES for a total value of ₹3.11 Cr.
This procurement is part of ongoing efforts by central government agencies and public sector undertakings to maintain and upgrade public infrastructure and services in New Delhi. Vendors interested in similar opportunities can browse other tenders from the same issuing organisation below.
Tender Documents
Download official tender documents, technical specifications, schedules, and BOQ files
finance_738448.pdf
BOQ Comparative Chart
techsummary_738448.pdf
finsummary_738448.pdf
1141-LOA.pdf
As per quoted rate
As per quoted rate
As per quoted rate
| Bidder | Submitted On | Status | Fin. Value | Rank | Remarks / Logs |
|---|---|---|---|---|---|
BHAVAN ENTERPRISES #2627836 | 10-Aug-2022 07:19 PM | Accepted-AOC Updated: 09-Sep-2022 05:50 PM | 3,66,15,171.87 | L1 | As per quoted rate |
MODTECH #2627839 | 11-Aug-2022 12:19 PM | Rejected-AOC Updated: 09-Sep-2022 05:50 PM | 3,82,52,866.09 | L3 | As per quoted rate |
PRAGATI CONSTRUCTION CONSULTANTS #2629296 | 10-Aug-2022 05:00 PM | Rejected-AOC Updated: 09-Sep-2022 05:50 PM | 3,71,08,713.84 | L2 | As per quoted rate |
Bid Evaluation Details & Logs
technical evaluation
Date: 09-Sep-2022 05:48 PM
Officer: Manvendra Singh
finance evaluation
Date: 09-Sep-2022 05:50 PM
Officer: Manvendra Singh
About This Procurement Notice
This central government tender was issued by Delhi Metro Rail Corporation Limited. The estimated contract value is ₹3.11 Cr. Bids must be submitted by 11-Aug-2022 02:00 PM.
BiharInfraTales aggregates procurement notices from Bihar eProcurement, GeM portal, and central government tender portals. Data is refreshed every 30 minutes. Always verify details on the official portal before submitting a bid.
Frequently Asked Questions
- QWhat is the status of the tender "Construction of New Operational Control Centre (OCC) at 3rd floor in Metro Bhawa"?
- The current status of this tender is "Expired". The submission deadline is 11-Aug-2022 02:00 PM. This information is sourced from official government procurement portals.
- QWho issued this central government tender?
- This tender was issued by Delhi Metro Rail Corporation Limited. The reference number is OCW-1141. It is a central government procurement notice.
- QWhat is the estimated value of this tender?
- The estimated tender value is ₹3.11 Cr. This is the approximate contract value as disclosed in the official tender document.
- QWho won the contract for this tender?
- The contract for "Construction of New Operational Control Centre (OCC) at 3rd floor in Metro Bhawan at Barakhamba Road, New Delhi" was awarded to BHAVAN ENTERPRISES with an awarded contract value of ₹3.11 Cr.
- QWhat is the final awarded contract value?
- The final awarded contract value is ₹3.11 Cr (0% above the estimated PAC of ₹3.11 Cr).