MDRRCD BiharCompleted
HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. Package No. BR02RC327
#696
Road Division Aurangabad.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road Project✓ Completed
Agreement₹4.36 Cr
Length0.09 km
Start28-02-2023
Completion06-02-2026
MDR · South Wing
Road Division Aurangabad.
M/S Surendra Pd. & Co.
Project Details
Project No.696
WingSouth Wing
DivisionRoad Division Aurangabad.
CircleMagadh Road Circle Gaya
Road TypeMDR
HeadState Plan
Cost & Timeline
Agreement Value₹4.36 Cr
Sanctioned Length0.09 km
ContractorM/S Surendra Pd. & Co.
AA Date30-09-2022
Start Date28-02-2023
Expected Completion06-02-2026
HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. Package No. BR02RC327 is a Bihar Road Construction Department (RCD) project under Road Division Aurangabad., classified as a MDR. The agreement amount for this project is ₹4.36 Cr, and the current status is Completed.
RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.
Remarks
Construction Work completed.
SE Inspection Log
Superintending Engineer quality visit record
Magadh Road Circle Gaya · Road Division Aurangabad.
Visited: 26 Mar 2025"
"Attached Report"
Frequently Asked Questions
- What is the current status of the Bihar RCD project "HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. Package No. BR02RC32"?
- Status: Completed. This MDR project under Road Division Aurangabad. (Magadh Road Circle Gaya) covers 0.09 km of road work. Expected completion: 06-02-2026.
- Who is the contractor for RCD project 696?
- The contractor for this project is M/S Surendra Pd. & Co.. Project number: 696. Division: Road Division Aurangabad.. Administrative approval date: 30-09-2022.
- What is the agreement value for this Bihar road project?
- The agreement value for "HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. " is ₹4.36 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Aurangabad..
- What does RCD PMIS track in Bihar?
- Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 696 "HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. " is one of thousands of road improvement and construction works tracked by BiharInfraTales.