MDRRCD BiharCompleted
HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. Package No. BR02RC327
#696
Road Division Aurangabad.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road Project✓ Completed
Agreement₹4.36 Cr
Length0.09 km
Start28-02-2023
Completion06-02-2026
MDR · South Wing
Road Division Aurangabad.
M/S Surendra Pd. & Co.
Project Details
6 FieldsProject No.
696
Wing
South Wing
Division
Road Division Aurangabad.
Circle
Magadh Road Circle Gaya
Road Type
MDR
Head
State Plan
Cost & Timeline
6 FieldsAgreement Value
₹4.36 Cr
Sanctioned Length
0.09 km
Contractor
M/S Surendra Pd. & Co.
AA Date
30-09-2022
Start Date
28-02-2023
Expected Completion
06-02-2026
HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. Package No. BR02RC327 is a Bihar Road Construction Department (RCD) project under Road Division Aurangabad., classified as a MDR. The agreement amount for this project is ₹4.36 Cr, and the current status is Completed.
RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.
Remarks
Construction Work completed.
SE Inspection Log
Superintending Engineer quality visit record
Magadh Road Circle Gaya · Road Division Aurangabad.
Visited: 26 Mar 2025"
"Attached Report"
?
Frequently Asked Questions
- QWhat is the current status of the Bihar RCD project "HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. Package No. BR02RC32"?
- Status: Completed. This MDR project under Road Division Aurangabad. (Magadh Road Circle Gaya) covers 0.09 km of road work. Expected completion: 06-02-2026.
- QWho is the contractor for RCD project 696?
- The contractor for this project is M/S Surendra Pd. & Co.. Project number: 696. Division: Road Division Aurangabad.. Administrative approval date: 30-09-2022.
- QWhat is the agreement value for this Bihar road project?
- The agreement value for "HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. " is ₹4.36 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Aurangabad..
- QWhat does RCD PMIS track in Bihar?
- Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 696 "HL RCC Bridge (4x21.75m) at 2+500km in Paraiya-Ganjoi Road. " is one of thousands of road improvement and construction works tracked by BiharInfraTales.