Widening & Strengthening work for Runnisaidpur-Belsand-Parsauni Road (Single Lane to Intermediate Lane) from CH-13+040 to 21+800 (Total Length-8.760 km.) and construction of H.L RCC Bridge 4 x 14m at CH-14+040, 1 x 12m at CH-14+190 and 2 x 12m at CH-15+3
Project Details
6 FieldsCost & Timeline
6 FieldsWidening & Strengthening work for Runnisaidpur-Belsand-Parsauni Road (Single Lane to Intermediate Lane) from CH-13+040 to 21+800 (Total Length-8.760 km.) and construction of H.L RCC Bridge 4 x 14m at CH-14+040, 1 x 12m at CH-14+190 and 2 x 12m at CH-15+3 is a Bihar Road Construction Department (RCD) project under Road Division Sitamarhi., classified as a MDR. The agreement amount for this project is ₹48.82 Cr, and the current status is Completed.
RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.
Remarks
Work Completed. (i) Delay due to heavy rainfall (ii) Catchment area very deep (iii) Water logging at the site for long time. Bridge-3 Well/Pile / Pier & other structure All Bridge work completed
SE Inspection Log
Superintending Engineer quality visit record
North Bihar Road Circle Muzaffarpur · Road Division Sitamarhi.
Visited: 18 Jan 2025"Road crust is in good condition"
Frequently Asked Questions
- QWhat is the current status of the Bihar RCD project "Widening & Strengthening work for Runnisaidpur-Belsand-Parsauni Road (Single Lan"?
- Status: Completed. This MDR project under Road Division Sitamarhi. (North Bihar Road Circle Muzaffarpur) covers 8.76 km of road work. Expected completion: 27-10-2023.
- QWho is the contractor for RCD project 526?
- The contractor for this project is M/s Kabbu Khirhar. Project number: 526. Division: Road Division Sitamarhi.. Administrative approval date: 17-03-2022.
- QWhat is the agreement value for this Bihar road project?
- The agreement value for "Widening & Strengthening work for Runnisaidpur-Belsand-Parsa" is ₹48.82 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Sitamarhi..
- QWhat does RCD PMIS track in Bihar?
- Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 526 "Widening & Strengthening work for Runnisaidpur-Belsand-Parsa" is one of thousands of road improvement and construction works tracked by BiharInfraTales.