Major BridgeRCD BiharCompleted

Construction of High Level RCC Bridge (6x18.00) over Malahi River at Baraun to Radhwa Road for the Year 2019-20 (BR25RC-253)

#488
Road Division Nawada.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road Project✓ Completed
Agreement₹6.60 Cr
Length0.11 km
Start16-01-2021
Completion23-03-2023
Major Bridge · South Wing
Road Division Nawada.
M/s Sagar Construction

Project Details

6 Fields
Project No.
488
Wing
South Wing
Division
Road Division Nawada.
Circle
Magadh Road Circle Gaya
Road Type
Major Bridge
Head
State Plan

Cost & Timeline

6 Fields
Agreement Value
₹6.60 Cr
Sanctioned Length
0.11 km
Contractor
M/s Sagar Construction
AA Date
31-08-2019
Start Date
16-01-2021
Expected Completion
23-03-2023

Construction of High Level RCC Bridge (6x18.00) over Malahi River at Baraun to Radhwa Road for the Year 2019-20 (BR25RC-253) is a Bihar Road Construction Department (RCD) project under Road Division Nawada., classified as a Major Bridge. The agreement amount for this project is ₹6.60 Cr, and the current status is Completed.

RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.

?

Frequently Asked Questions

QWhat is the current status of the Bihar RCD project "Construction of High Level RCC Bridge (6x18.00) over Malahi River at Baraun to R"?
Status: Completed. This Major Bridge project under Road Division Nawada. (Magadh Road Circle Gaya) covers 0.11 km of road work. Expected completion: 23-03-2023.
QWho is the contractor for RCD project 488?
The contractor for this project is M/s Sagar Construction. Project number: 488. Division: Road Division Nawada.. Administrative approval date: 31-08-2019.
QWhat is the agreement value for this Bihar road project?
The agreement value for "Construction of High Level RCC Bridge (6x18.00) over Malahi " is ₹6.60 Cr. This is a Major Bridge project under Bihar Roads Construction Department (RCD) in Road Division Nawada..
QWhat does RCD PMIS track in Bihar?
Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 488 "Construction of High Level RCC Bridge (6x18.00) over Malahi " is one of thousands of road improvement and construction works tracked by BiharInfraTales.