MDRRCD BiharCompleted
Widening Strengthening work in Sinha College More to Rafiganj Road (Km 12.20 to 18.40, Total Length : 6.20 km) for the year 2019-20
#362
Road Division Aurangabad.
Magadh Road Circle Gaya
Bihar RCD PMIS — Road Project✓ Completed
Agreement₹7.53 Cr
Length6.20 km
Start16-05-2020
Completion22-04-2021
MDR · South Wing
Road Division Aurangabad.
RAMIYA CONSTRUCTIONS PRIVATE LIMITED
Project Details
6 FieldsProject No.
362
Wing
South Wing
Division
Road Division Aurangabad.
Circle
Magadh Road Circle Gaya
Road Type
MDR
Head
State Plan
Cost & Timeline
6 FieldsAgreement Value
₹7.53 Cr
Sanctioned Length
6.20 km
Contractor
RAMIYA CONSTRUCTIONS PRIVATE LIMITED
AA Date
22-08-2019
Start Date
16-05-2020
Expected Completion
22-04-2021
Widening Strengthening work in Sinha College More to Rafiganj Road (Km 12.20 to 18.40, Total Length : 6.20 km) for the year 2019-20 is a Bihar Road Construction Department (RCD) project under Road Division Aurangabad., classified as a MDR. The agreement amount for this project is ₹7.53 Cr, and the current status is Completed.
RCD projects like this form part of Bihar's state highway and rural road network expansion. Other road projects under the same division are listed below.
Remarks
Construction work completed.
?
Frequently Asked Questions
- QWhat is the current status of the Bihar RCD project "Widening Strengthening work in Sinha College More to Rafiganj Road (Km 12.20 to "?
- Status: Completed. This MDR project under Road Division Aurangabad. (Magadh Road Circle Gaya) covers 6.20 km of road work. Expected completion: 22-04-2021.
- QWho is the contractor for RCD project 362?
- The contractor for this project is RAMIYA CONSTRUCTIONS PRIVATE LIMITED. Project number: 362. Division: Road Division Aurangabad.. Administrative approval date: 22-08-2019.
- QWhat is the agreement value for this Bihar road project?
- The agreement value for "Widening Strengthening work in Sinha College More to Rafigan" is ₹7.53 Cr. This is a MDR project under Bihar Roads Construction Department (RCD) in Road Division Aurangabad..
- QWhat does RCD PMIS track in Bihar?
- Bihar RCD (Road Construction Department) PMIS (Project Management Information System) tracks state highway, major district road, and rural road construction projects across Bihar. Project 362 "Widening Strengthening work in Sinha College More to Rafigan" is one of thousands of road improvement and construction works tracked by BiharInfraTales.