East Central RailwayIn Progress

Yard Remodelling at Darbhanga: Linking BG track manually, Linking level crossing, Supply, Unloading and Spreading of stone ballast, Leading and Unloading 52 Kg/60 Kg Rails and PSC sleepers, Spreading of PSC sleepers, Linking and Packing of BG Track, BG Points & Crossings etc, Extension of existing Platforms and Construction of SSI Buildings in Darbhanga Yard in connection with Doubling of Darbhanga Sitamarhi section

Work #186
As of June 2026

Estimate Cost

₹25.00 Cr

Sanctioned estimate

Tendered Cost

₹25.00 Cr

0.0% vs estimate

Physical Progress

30%

Work completed

Status

In Progress

Current stage

East Central Railway — CAO (Con)In Progress
Tendered₹25.00 Cr
Progress30%
Started18-07-2025
Target DOC07-07-2026
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ

Work Details

5 Fields
Work No.
186
Acceptance / LOA
8.6044E+11 (as recorded in source)
Officer in Charge
Mahboob Alam, CE/C/NC/MHX; Mantu Kumar, Dy CE/C/I/SPJ; Rakesh Ranjan, AEN/C/SPJ
Report Period
June 2026

Cost, Progress & Timeline

6 Fields
Estimate Cost
₹25.00 Cr
Tendered Cost
₹25.00 Cr
Physical Progress
30%
Date Started
18-07-2025
Original DOC
07-07-2026
Extended DOC
N/A

Yard Remodelling at Darbhanga: Linking BG track manually, Linking level crossing, Supply, Unloading and Spreading of stone ballast, Leading and Unloading 52 Kg/60 Kg Rails and PSC sleepers, Spreading of PSC sleepers, Linking and Packing of BG Track, BG Points & Crossings etc, Extension of existing Platforms and Construction of SSI Buildings in Darbhanga Yard in connection with Doubling of Darbhanga Sitamarhi section is an East Central Railway (ECR) infrastructure work in Bihar, executed by RN Choudhary-Kishanganj. The tendered cost of the work is ₹25.00 Cr, and it is currently In Progress with physical progress recorded at 30%.

Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.

?

Frequently Asked Questions

QWhat is the current status of the railway work "Yard Remodelling at Darbhanga: Linking BG track manually, Linking level crossing"?
Status: In Progress. This East Central Railway work is being executed by RN Choudhary-Kishanganj. Physical progress stands at 30%. Current date of completion (DOC): 07-07-2026.
QWho is the agency for this Bihar railway project?
The agency for this work is RN Choudhary-Kishanganj. Acceptance / agreement reference: 8.6044E+11 (as recorded in source). Work started on 18-07-2025.
QWhat is the cost of this railway work?
The tendered cost of "Yard Remodelling at Darbhanga: Linking BG track manually, Li" is ₹25.00 Cr (against an estimate of ₹25.00 Cr). This is an East Central Railway (ECR) infrastructure work in Bihar.
QWhat railway works are tracked on BiharInfraTales?
BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Yard Remodelling at Darbhanga: Linking BG track manually, Li" is one of hundreds of railway works covered.