East Central RailwayNot Started
Construction of Type-VI Qtrs. (28 Units) above existing Block-C (G+5 storied) structure at Patliputra Rail Parisar, Digha Ghat, Patna
Estimate Cost
N/A
Sanctioned estimate
Tendered Cost
₹28.37 Cr
Awarded value
Physical Progress
0%
Work completed
Status
Not Started
Current stage
East Central Railway — CAO (Con)Not Started
Tendered₹28.37 Cr
Progress0%
Started02-10-2025
Target DOC22-08-2027
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Work Details
5 FieldsWork No.
297
Agency
S T Construction Pvt Ltd-Gautam Budh Nagar
SF 24 Ansal Fortune Arcade, Sector-18, Noida, Dist. Gautam Budh Nagar-201301, Uttar Pradesh, India
Acceptance / LOA
ECR-CAO-C-N-ETN-07-25-26/01146550137343 dated 23/08/2025
Officer in Charge
Indrajeet Kumar, CE/C/NW; Prabhat Kumar, DyCE/C/II/HJP; Raj Kumar Mandal, AEN/C/HJP
Report Period
June 2026
Cost, Progress & Timeline
6 FieldsEstimate Cost
N/A
Tendered Cost
₹28.37 Cr
Physical Progress
0%
Date Started
02-10-2025
Original DOC
22-08-2027
Extended DOC
N/A
Construction of Type-VI Qtrs. (28 Units) above existing Block-C (G+5 storied) structure at Patliputra Rail Parisar, Digha Ghat, Patna is an East Central Railway (ECR) infrastructure work in Bihar, executed by M/s S T Construction Pvt. Ltd.-Gautam Budh Nagar. The tendered cost of the work is ₹28.37 Cr, and it is currently Not Started with physical progress recorded at 0%.
Railway works like this — road over/under bridges, station buildings, track linking and allied civil works — are monitored by the CAO (Construction) office of East Central Railway. Other works by the same agency are listed below.
?
Frequently Asked Questions
- QWhat is the current status of the railway work "Construction of Type-VI Qtrs. (28 Units) above existing Block-C (G+5 storied) st"?
- Status: Not Started. This East Central Railway work is being executed by M/s S T Construction Pvt. Ltd.-Gautam Budh Nagar. Physical progress stands at 0%. Current date of completion (DOC): 22-08-2027.
- QWho is the agency for this Bihar railway project?
- The agency for this work is M/s S T Construction Pvt Ltd-Gautam Budh Nagar, SF 24 Ansal Fortune Arcade, Sector-18, Noida, Dist. Gautam Budh Nagar-201301, Uttar Pradesh, India. Acceptance / agreement reference: ECR-CAO-C-N-ETN-07-25-26/01146550137343 dated 23/08/2025. Work started on 02-10-2025.
- QWhat is the cost of this railway work?
- The tendered cost of "Construction of Type-VI Qtrs. (28 Units) above existing Bloc" is ₹28.37 Cr. This is an East Central Railway (ECR) infrastructure work in Bihar.
- QWhat railway works are tracked on BiharInfraTales?
- BiharInfraTales tracks East Central Railway (ECR) construction works in Bihar — road over bridges (ROB), road under bridges (RUB), station buildings, track linking, and allied civil works monitored by the CAO (Construction) office. "Construction of Type-VI Qtrs. (28 Units) above existing Bloc" is one of hundreds of railway works covered.